Free tool · RegulatoryUpdated November 1, 2026

Clinical trial regulatory reporting calendar: DSUR, IND annual report, registry and EU CTR dates

Enter five dates and choose US, EU or both. The tool lists each periodic and event-driven deadline with its rule, sorts them in date order, and exports an .ics calendar file. A planning aid, not legal advice.

  • DSUR and IND annual report
  • ClinicalTrials.gov and EU CTR
  • Download .ics

Free sandbox · No credit card · 21 CFR Part 11 compliant

  • ISO 27001 certified
  • 21 CFR Part 11 compliant
  • GDPR compliant
  • EU and US data hosting
  • HIPAA compliant
  • ICH GCP E6(R3) compliant
Demo deadlines · IND effective 15 Mar 2027

Regions

US + EU

Items

13 dates

  • ClinicalTrials.gov registration3 May 2027
  • DSUR 1 lock point19 Nov 2027
  • DSUR 1 to authorities18 Jan 2028
  • IND annual report 114 May 2028
  • EU end-of-trial notice15 Oct 2028
  • ClinicalTrials.gov results31 Mar 2029
Demo data. Calendar days, no weekend roll.

Reporting dates in brief

  • Four different clocks start from four different events: the IND effective date (annual report), the DIBD (DSUR), first participant enrolled (registry) and primary completion or end of trial (results). Mixing them up is the usual cause of a missed date.
  • The IND annual report is due within 60 days of the anniversary of the date the IND went into effect (21 CFR 312.33). It is not the anniversary of the submission.
  • The DSUR covers one year from the DIBD, the date of the first authorisation to run a trial of the product in any country. The report goes to authorities within 60 calendar days of the data lock point (ICH E2F).
  • ClinicalTrials.gov needs registration within 21 days after the first participant is enrolled (42 CFR 11.24) and results within 1 year of primary completion (42 CFR 11.44), for applicable clinical trials.
  • Under the EU CTR the end of the trial is notified within 15 days and the summary of results follows within 1 year, or 6 months for paediatric trials (Regulation 536/2014, Art. 37). Check the current text of every rule before you rely on a date.

Free tool

Build your regulatory reporting calendar

The worked example is loaded: a US and EU study with an IND effective on 15 March 2027. Change any date, choose the region, and download the .ics. Nothing is saved or sent.

30 days after FDA receives the IND, or the date FDA says you may proceed if earlier.

Date of the first authorisation to conduct a trial of the product in any country.

Final date data were collected for the primary outcome.

EU: the end of the trial as defined in the protocol (usually last visit of the last participant).

Trial includes paediatric participants
  1. ClinicalTrials.gov registration dueMon, 3 May 2027

    US42 CFR 11.24: within 21 days after the first human subject is enrolled (applicable clinical trials only) Check that your trial is an applicable clinical trial and what counts as enrolment under your protocol.

  2. DSUR 1: data lock pointFri, 19 Nov 2027

    ICHICH E2F: annual period starts at the DIBD; this tool puts the lock point on the day before each anniversary

  3. DSUR 1: report due to authoritiesTue, 18 Jan 2028

    ICHICH E2F: within 60 calendar days of the data lock point Regional rules decide where it is sent and whether a DSUR can replace a local annual report.

  4. IND annual report 1Sun, 14 May 2028

    US21 CFR 312.33: within 60 days of the anniversary of the date the IND went into effect Anniversary 2028-03-15.

  5. EU CTR: end-of-trial notificationSun, 15 Oct 2028

    EUReg. (EU) 536/2014 Art. 37: within 15 days from the end of the trial (per Member State, and for the last Member State concerned)

  6. DSUR 2: data lock pointSun, 19 Nov 2028

    ICHICH E2F: annual period starts at the DIBD; this tool puts the lock point on the day before each anniversary

  7. DSUR 2: report due to authoritiesThu, 18 Jan 2029

    ICHICH E2F: within 60 calendar days of the data lock point Regional rules decide where it is sent and whether a DSUR can replace a local annual report.

  8. ClinicalTrials.gov results dueSat, 31 Mar 2029

    US42 CFR 11.44: within 1 year after the primary completion date A certification for delayed submission (11.44(b) or (c)) can move this; check the rule for the conditions and the outer limit.

  9. IND annual report 2Mon, 14 May 2029

    US21 CFR 312.33: within 60 days of the anniversary of the date the IND went into effect Anniversary 2029-03-15.

  10. EU CTR: summary of results dueSun, 30 Sept 2029

    EUReg. (EU) 536/2014 Art. 37(4): within 1 year (6 months if the trial includes paediatric participants) of the end of the trial Measured from the end of the trial in all Member States concerned; a protocol can justify a later date for scientific reasons.

  11. DSUR 3: data lock pointMon, 19 Nov 2029

    ICHICH E2F: annual period starts at the DIBD; this tool puts the lock point on the day before each anniversary

  12. DSUR 3: report due to authoritiesFri, 18 Jan 2030

    ICHICH E2F: within 60 calendar days of the data lock point Regional rules decide where it is sent and whether a DSUR can replace a local annual report.

  13. IND annual report 3Tue, 14 May 2030

    US21 CFR 312.33: within 60 days of the anniversary of the date the IND went into effect Anniversary 2030-03-15.

Planning aid, not legal advice. Calendar days, no weekend or holiday roll. Rules change: check the current text of each regulation. Runs in your browser; nothing is stored or sent.

The method

How each date is calculated

IND annual report. The anniversary is the IND effective date plus whole years, and the due date is 60 calendar days later. With an effective date of Monday 15 March 2027 the first anniversary is 15 March 2028 and the report is due on 14 May 2028. The effective date is normally 30 days after FDA receives the IND, or earlier if FDA tells you that you may proceed (check 21 CFR 312.40). If you change the effective date by even a day, every annual date moves with it.

DSUR. The reporting period starts at the DIBD. With a DIBD of 20 November 2026 the first data lock point sits just before the first anniversary, on 19 November 2027, and the report is due 60 days later, on 18 January 2028. Sources differ on the convention for the lock point. Some sponsors use the day before each anniversary, others fix it at the last day of a month. The tool offers both: the month-end option moves the first lock point to 31 October 2027 and the due date to 30 December 2027. Whichever you pick, write it in the safety management plan and keep it for every later report.

ClinicalTrials.gov. Registration is first enrolment plus 21 days, so 12 April 2027 gives 3 May 2027. Results are primary completion plus one year, so 31 March 2028 gives 31 March 2029. The rule allows a certification for delayed submission in defined circumstances; the tool does not model it, because the conditions matter and you should read them in the rule.

EU CTR. The end-of-trial notice is the end date plus 15 days (30 September 2028 gives 15 October 2028). The summary of results is the end date plus 12 months, or 6 months when the trial includes paediatric participants, using calendar-month arithmetic: 30 September 2028 gives 30 September 2029, or 30 March 2029 for a paediatric trial. A temporary halt or early termination is notified within 15 days, and a halt for subject safety must be notified without undue delay and not later than 15 days.

Checking one date by hand

Take a DIBD of 20 November 2026. Add one year to get 20 November 2027, subtract one day for the lock point (19 November 2027). From 19 November, 11 days remain in November and 31 in December, which is 42 days, and 18 more days in January make 60. The report is due 18 January 2028. The tool does exactly this arithmetic in UTC calendar days, so there is no daylight-saving drift.

The rules

The deadlines this tool lists

DeadlineClock starts atPeriodSource to check
IND annual reportAnniversary of the IND effective date60 days21 CFR 312.33
DSUR data lock pointDIBD, each anniversaryOne-year reporting periodICH E2F
DSUR submissionData lock point60 calendar daysICH E2F
Registry registrationFirst participant enrolled21 days42 CFR 11.24
Registry resultsPrimary completion date1 year (delay by certification possible)42 CFR 11.44
EU end-of-trial noticeEnd of the trial15 daysReg. 536/2014 Art. 37
EU summary of resultsEnd of the trial1 year, 6 months if paediatricReg. 536/2014 Art. 37(4)
EU halt or early terminationDate of the halt or termination15 daysReg. 536/2014 Arts. 37, 38

Left out on purpose: SAE and SUSAR clocks (see the [SAE reporting deadline calculator](/solutions/sae-reporting-deadline-calculator)), national rules, IRB continuing review and country-specific periodic reports.

Know the dates, then build the study that earns them

Set up your forms, visits and consent in the free sandbox before you pick the go-live date that starts these clocks. No credit card.

Build your study free

Where teams slip

Five mistakes that move a deadline

The first mistake is anchoring the IND annual report to the submission date. The rule runs from the date the IND went into effect, so keep the FDA acknowledgement letter and record the effective date in the study file. The second is treating the DIBD as a property of the study. It belongs to the product: if a trial of the same drug was first authorised in another country two years ago, your first DSUR period started then. A sponsor with several studies of one product usually writes one DSUR for the product, not one per trial.

The third is confusing primary completion with the end of the study. Primary completion is the final date data were collected for the primary outcome, so a trial with long safety follow-up can reach it a year before the end of the trial. Results are due after primary completion, not after the last visit. The fourth is forgetting that the EU end of trial is a defined date in the protocol, not the date the database is locked. Use the definition in your protocol and keep the same one for the ClinicalTrials.gov registration record.

The fifth is reading a rule you have not checked. Registration and results duties apply to applicable clinical trials, a defined group that excludes, for example, phase 1 drug trials; the ClinicalTrials.gov glossary entry and the registration guide explain the test. EU duties depend on whether the trial is under the CTR, and the periodic safety report may need to go to several authorities. For the US filing mechanics read Part 312 explained, and for the EU side the EU CTR software page. A study timeline is easier to plan with the clinical trial timeline calculator.

In Capture

What Capture does and does not do for reporting

Capture does not file reports, track regulatory deadlines or send alerts for them. It is the system that holds the data those reports are built from, so the numbers you submit trace back to a record.

  • A field-level audit trail records the user, old value, new value and reason for every change, and it cannot be modified from the interface.
  • 21 CFR Part 11-compliant controls and eConsent with email OTP and countersignature; validated use remains a shared responsibility with the sponsor.
  • CSV and Excel exports with a data dictionary, by-site and date-range filters, and SDTM export as SAS XPT with Define-XML.
  • Hosting in the EU (Frankfurt) or the USA (N. Virginia).
See the 21 CFR Part 11 checklist

Weight changed 68.0 to 68.5 kg

Site coordinator · Reason: Transcription error

9f2c…a71e

Query Q-0014 answered on Weight

Site coordinator · Reason: Source checked

4b8d…c203

Vital signs form locked

Data manager · Reason: Visit cleaned

e61a…58f0
Verify chain Intact

Set-up checklist

Before you rely on the calendar

Effective date confirmed

File the FDA letter or the date you counted from; compute the anniversary once and put it in the study plan.

DIBD documented per product

Record the first authorisation anywhere, with the document that proves it.

Lock-point convention written down

State day-before-anniversary or month-end in the safety management plan.

Protocol definitions aligned

Primary completion and end of trial defined once and used for every registry and notification.

Applicable-trial test recorded

Note whether registration and results duties apply and why.

Owners and reminders set

Each date has a named owner and a reminder at least four weeks earlier, in the .ics file or your own system.

FAQ

Questions teams ask before they switch

Something not covered here? Ask us directly.

When is the IND annual report due?

Within 60 days of the anniversary of the date the IND went into effect (21 CFR 312.33). The clock runs from the effective date, not from the date you submitted the application. Check the current text of 312.33 for what the report must contain.

What is the DIBD and why does it start the DSUR clock?

The DIBD is the Development International Birth Date: the date of the first authorisation to conduct a clinical trial of the product in any country. ICH E2F uses it as the start of the one-year DSUR reporting period, and the report is submitted within 60 calendar days of the data lock point.

Can a DSUR replace the IND annual report?

FDA has discussed accepting a DSUR in place of the annual report in some circumstances, but sources we checked disagree on the exact position and the annual report rule has been the subject of proposed changes. Confirm the current FDA position before you skip the 312.33 report.

How long after the first participant is enrolled must I register on ClinicalTrials.gov?

Within 21 calendar days after the first human subject is enrolled (42 CFR 11.24), for an applicable clinical trial. Enrolment generally means the participant agreed to take part after consent; check how your protocol defines it and what the NLM guidance says.

When are ClinicalTrials.gov results due?

One year after the primary completion date (42 CFR 11.44), the final date data were collected for the primary outcome. A certification for delayed submission is possible in defined circumstances. The tool shows the standard date only.

What are the EU CTR reporting dates after a trial ends?

The end of the trial is notified within 15 days. A summary of results follows within one year of the end of the trial, or six months where the trial includes paediatric participants, with a protocol-justified exception for scientific reasons (Regulation 536/2014, Art. 37). Check the EUR-Lex text and the CTIS guidance.

Does the calendar skip weekends and public holidays?

No. It uses calendar days, which is how these periods are written. If a due date falls on a weekend, plan to submit earlier rather than assume it rolls forward.

Is anything stored or sent?

No. The dates stay in your browser and the .ics file is built locally. This is a planning aid, not legal advice.

Put the study behind the deadlines

Build forms, visits and consent in the free sandbox, then go live when you are ready. No credit card; you pay only once real participants are enrolled.

Build your study free