Enter the number of completers you need, the months you have to enrol, what one site recruits at full speed, how fast sites open, and your screen-failure and dropout rates. Get the number of sites, a month-by-month activation schedule and a version of the answer for a slower per-site rate.
Free sandbox · No credit card · 21 CFR Part 11 compliant
To consent
179
Sites needed
11
If rate −30%
17
If rate −50%
Not reachable
11 sites
13 sites
17 sites
Choosing a site count in brief
Free tool
The example loads a 120-completer trial with an 18-month window. Change any input and the answer, the sensitivity table and the monthly schedule update. Nothing is saved or sent.
After randomisation
Of those consented
Consented participants per site per month
0 = every site open from month 0
Linear from 0 to full rate
With 11 sites opening 2 per month, the expected total at the end of month 18 is 191.4 consented.
| Rate | Sites needed | Your 11 sites would give |
|---|---|---|
| 100% (1.20) | 11 | 129 completers |
| 85% (1.02) | 13 | 110 completers |
| 70% (0.84) | 17 | 90 completers |
| 50% (0.60) | not reachable | 65 completers |
| Month | Sites opened | Sites open | Consented this month | Cumulative consented | Cumulative completers |
|---|---|---|---|---|---|
| 1 | 2 | 2 | 0.4 | 0.4 | 0.3 |
| 2 | 2 | 4 | 1.9 | 2.3 | 1.5 |
| 3 | 2 | 6 | 4.2 | 6.5 | 4.4 |
| 4 | 2 | 8 | 6.6 | 13.1 | 8.8 |
| 5 | 2 | 10 | 9.0 | 22.1 | 14.9 |
| 6 | 1 | 11 | 11.3 | 33.4 | 22.5 |
| 7 | 0 | 11 | 12.8 | 46.2 | 31.2 |
| 8 | 0 | 11 | 13.2 | 59.4 | 40.1 |
| 9 | 0 | 11 | 13.2 | 72.6 | 49.0 |
| 10 | 0 | 11 | 13.2 | 85.8 | 57.9 |
| 11 | 0 | 11 | 13.2 | 99.0 | 66.8 |
| 12 | 0 | 11 | 13.2 | 112.2 | 75.7 |
| 13 | 0 | 11 | 13.2 | 125.4 | 84.6 |
| 14 | 0 | 11 | 13.2 | 138.6 | 93.6 |
| 15 | 0 | 11 | 13.2 | 151.8 | 102.5 |
| 16 | 0 | 11 | 13.2 | 165.0 | 111.4 |
| 17 | 0 | 11 | 13.2 | 178.2 | 120.3 |
| 18 | 0 | 11 | 13.2 | 191.4 | 129.2 |
Planning aid, not a promise: expected values from a smooth model (sites open at even intervals, each ramps linearly to its full rate). Real sites vary, so treat the answer as a minimum and add contingency. Runs in your browser; nothing is stored or sent.
The method
Step 1, the funnel. Suppose the protocol needs 120 participants to complete. With 10% dropout you must randomise 120 ÷ 0.90 = 133.3, so 134. With 25% screen failure you must consent 134 ÷ 0.75 = 178.7, so 179. These are the same two divisions as in the enrollment forecast calculator, so a plan made in one tool agrees with the other. If your dropout figure is a planning guess, the dropout-adjusted sample size calculator shows how it feeds the statistical section of the protocol.
Step 2, when each site opens. If you open two sites per month, site 1 opens at month 0, site 2 half a month later, site 3 a month later, and so on, evenly spaced at one over the pace in months. Setting the pace to 0 means every site is open from the start, the best case and the answer a feasibility spreadsheet usually gives. The difference between the two answers is the cost of staggered activation: in the demo, 9 sites if all open together against 11 at two per month and 15 at one per month.
Step 3, the ramp-up. A newly opened site needs staff trained, its first consents and a rhythm. The tool ramps each site linearly from zero to its full rate over the ramp-up months. A site that has been open for T months, with a ramp of R months and a full rate r per month, has recruited r × T²/(2R) if T ≤ R, and r × (R/2 + T − R) after that. Add this up for every site that opens before the window closes.
Step 4, the smallest site count that reaches the target. The tool tries 1 site, 2 sites and so on, until the expected total consented reaches the number from step 1. Because sites open one after another, a late site contributes only for the months it is open, so adding site 40 to a 12-month window helps far less than adding site 4.
One site, open all 12 months, no ramp and a rate of 1 consented participant per month gives 12. Three sites that open one per month, no ramp, a rate of 2 and a 6-month window give 2 × (6 + 5 + 4) = 30. Two sites opening one per month with a two-month ramp, a rate of 1 and a 6-month window give (1 + 4) + (1 + 3) = 9: the first site is open 6 months and the second 5, and each loses half the ramp length. The tool returns exactly 12, 30 and 9 for those inputs, which is a quick test for any enrolment spreadsheet you build yourself.
What moves the site count
Demo plan: 120 completers, 10% dropout, 25% screen failure, 18-month window, 1.2 consented per site per month, two sites opened per month, two-month ramp. Only the listed assumption changes.
| Change | To consent | Sites needed |
|---|---|---|
| Plan as entered | 179 | 11 |
| All sites open at month 0 | 179 | 9 |
| One site opened per month | 179 | 15 |
| Three or four sites opened per month | 179 | 10 |
| Per-site rate 0.84 (30% lower) | 179 | 17 |
| Per-site rate 0.60 (50% lower) | 179 | Not reachable |
| Screen failure 15% | 158 | 9 |
| Screen failure 35% | 207 | 13 |
| Screen failure 45% | 244 | 16 |
| Window 12 months | 179 | Not reachable |
| Window 15 months | 179 | 14 |
| Window 24 months | 179 | 7 |
| Ramp-up 0 months | 179 | 10 |
| Ramp-up 4 months | 179 | 12 |
Model output from the tool above. "Not reachable" means that even opening every site the pace allows inside the window does not produce enough participants.
Defensible inputs
Per-site rate. Feasibility questionnaires tend to be optimistic. A better anchor is the registry record of a comparable completed trial: divide its enrolment by its number of sites and by the months between first and last participant in. Count consented participants per open site per month, not eligible patients seen: a site that sees four eligible patients a month and consents a quarter of them is at 1.0. The clinical trial pre-screening tools page covers how earlier screening protects that figure, and the recruitment plan template is where the assumption should be written down.
Activation pace. Use the dates by which contracts, ethics or IRB approvals and drug supply will realistically allow a first consent, not the date a plan hopes for. If the first five sites open together and the rest follow at a steady trickle, enter the slower trickle as the pace and treat the first five as a bonus, or run the tool twice and compare.
Screen failure and dropout. Take them from your own pre-screening log or a pilot where you can, and count them at the same point as the target. A trial with a long run-in fails more people after consent than one with a simple checklist. The screening and enrolment log template records the reasons by site so the rate can be measured rather than guessed.
Contingency. The tool returns the minimum number of sites for the expected enrolment. Real sites vary, and some never recruit. Many teams select more sites than the minimum and plan to close the weakest ones. The sensitivity rows show how much margin each additional percentage point of rate shortfall costs, which helps size that margin.
| Input | Best source | Weak source | |
|---|---|---|---|
| Per-site rate | Comparable completed trial; your own site log | Site self-estimate on a survey | |
| Activation pace | Contract and approval status per site | The planned timeline | |
| Screen failure | Pre-screening log or pilot | A rule of thumb from another indication | |
| Dropout | Same endpoint, same follow-up length | Any trial with shorter follow-up |
Set up your sites, QR enrolment links and visit schedule in the free sandbox and test the flow before the first participant. No credit card.
In Capture
A site count is only useful if the sites can enrol on day one. Capture is built for multi-site studies, and the enrolment mechanics are the same whether you open three sites or thirty.
Now recruiting
Sleep and Recovery Study
A 12-week study of sleep quality after surgery. Takes 5 minutes a day on your phone.
Check if you can take partScan to join
Print it on posters and clinic flyers
Before you commit
Per-site rate means consented per site per month. If your source counts randomised, convert it first.
Run the tool at 70% of the planned rate and keep the answer next to the base case.
Each site in the count has a contract and approval route with a realistic date.
Do not count a site as at full speed in its first one or two months.
Decide in advance how many months of low enrolment trigger a replacement or closure.
Check the window against the clinical trial timeline calculator so start-up and close-out are not squeezed.
It depends on the number of participants to consent, the months available, what each site recruits per month and how quickly sites open. Convert completers to consented participants first, then find the smallest number of sites whose expected enrolment reaches that total in the window. The calculator above does both steps.
Divide the participants to consent by the rate per site per month and by the months each site is open. For example, 179 consented participants at 1.2 per site per month over 18 months needs about 8.3 sites if every site is open for the whole window. Staggered opening and ramp-up raise that, which is why the demo answer is 11.
Use the same point as your target in the funnel. This tool uses consented participants per site per month because screen failure sits between consent and randomisation. If your source figure counts randomised participants, divide it by (1 − screen failure) before you enter it.
You need more sites or more time. The sensitivity table shows both: in the demo a 30% lower rate raises the answer from 11 to 17 sites, and a 50% lower rate cannot be rescued by sites alone inside 18 months at two openings per month. A second lever is a longer window, and a third is a lower screen-failure rate.
The enrollment forecast calculator starts from a number of sites and returns a last-patient-in date with slow, base and fast cases. This calculator starts from the window and returns the number of sites and an activation schedule. They share the same funnel and the same site ramp idea, but the timing model differs in detail, so expect similar rather than identical numbers.
No. It assumes every site reaches the rate you enter. Many teams add sites above the calculated minimum as a buffer because some sites recruit nothing. Treat the result as a floor.
No. The calculation runs in your browser and nothing is saved or transmitted.
Keep exploring
Enrollment forecast calculator
From sites to a last-patient-in date.
Clinical trial timeline calculator
Check that the window fits the programme.
Dropout-adjusted sample size
Where the dropout input comes from.
Recruitment plan template
Write the assumptions down.
QR code participant enrollment
Site-specific enrolment links.
Create your sites and enrolment links in the free sandbox and test the whole flow before go-live. No credit card.