Checklist · Go-liveUpdated October 14, 2026

EDC go-live checklist: the gate before the first participant

UAT proves the build works. Go-live proves the whole study is ready to use it: people with access, sites trained, consent in place, safety routes agreed and a plan for the first two weeks. Use this checklist as a written gate with an owner and evidence for each line.

  • Eight readiness areas
  • Go/no-go criteria
  • First-week monitoring plan

Free sandbox · No credit card · 21 CFR Part 11 aligned

Go / no-go review · demo study

Study

DEMO-LIVE-07

Target

T-3 days

Decision

Pending

  • UAT summary signed, no open critical defectsData manager
  • All forms approved and locked for live use14 of 14
  • Site accounts created, two-factor enabled3 of 4 sites
  • Consent text approved by ethics, version matchesv1.2
  • Serious adverse event route tested end to endRetest
  • Hypercare owner and daily review slot namedFirst 14 days
Demo data. Your own protocol and quality system define the real gate.

What go-live means here

  • Go-live is a decision, not a date. Agree written criteria, name who decides and record the decision with the evidence.
  • It goes beyond UAT. UAT checks the build. The go-live gate also checks people, sites, consent, safety routes, documents and support. For testing, see the EDC UAT guide.
  • Rehearse in the sandbox. Run a full participant journey, including a query, a signature and an export, before real data exists.
  • Plan the first two weeks. Most first-week problems are small and fixable if someone is looking at the data daily.
  • Not every item applies to every study. Remove lines that do not fit, but record that you considered them.

Why a gate

UAT answers "does it work", go-live answers "are we ready"

A clean UAT report tells you the database does what the specification says. It does not tell you that the fourth site has an account, that the investigator knows where to sign, that the ethics-approved consent text matches what is in the system or that someone will read the first queries before they age. Those are the things that go wrong in the first week of a study, and they are cheap to check the week before.

The gate has two parts. A checklist confirms each area is ready and records the evidence. A short meeting then makes a go, conditional go or no-go decision. For a small team the meeting can be fifteen minutes and the evidence a shared folder. The discipline is in writing the criteria down in advance, so the decision is not made under launch-day pressure. This page is deliberately distinct from the EDC implementation timeline, which shows how long phases take, and from common EDC implementation mistakes, which lists failure modes.

Area 1

Build and validation evidence

Everything that proves the database is fit for use.

UAT summary signed

Scripts run, defects logged and closed, deviations accepted, sign-off by study lead and data manager.

Final forms approved and locked

No form left in draft that sites will need. In Capture only approved forms appear in the casebook.

Visit schedule and windows match the protocol

Compare the system schedule with the current protocol version, line by line.

Edit checks and auto-queries tested

Boundary values, missing data and date-order errors confirmed, with priorities agreed.

Calculated fields verified

Spot-check derived values (BMI, eGFR, QTc and others) against a manual calculation.

Data dictionary and test export reviewed

The statistician has opened a test export and agreed the structure.

Blank eCRF PDF exported

Version-labelled copy for the ethics file, the investigator site file and the archive.

Area 2

People, roles and access

The first-week failures you most often see.

Role matrix written and tested

Each role tested with a real account: what it sees, edits, signs and exports.

Accounts created for named people only

No shared logins. Delegation log matches who has data entry or signing rights.

Two-factor sign-in enabled for staff

Staff can turn on authenticator-app two-factor authentication; make it part of onboarding.

Blinded roles verified

A blinded test user confirmed not to see treatment-arm values in any view or export.

Identity and PII separation confirmed

Site coordinators see participant names; researchers see coded IDs. See role-based access control.

Off-boarding rule defined

Who removes access when someone leaves, and how quickly.

Area 3

Site readiness and training

Each site completed a sandbox rehearsal

One test participant entered end to end, including a query response.

Entry guide per form

One page each with definitions, units and what to do when a value is unknown.

Site participant numbering set

Site-level numbering (for example 001-0042) agreed, and enrolment links or QR codes issued per site where used.

Support route known

Sites know how to reach support. Capture offers email support, typically under 24 hours, plus documentation and video tutorials.

Site activation prerequisites met

Approvals, contracts, delegation log and training records are filed before the site is allowed to enrol.

Run the whole gate in the sandbox first

Build the study, create test sites and users, enter a participant from consent to export and answer a query on purpose. If something is missing from your checklist, you will see it in an afternoon, with no credit card.

Rehearse go-live free

Areas 6 to 8

Data flow, documents and first-week monitoring

Data management plan and validation plan current

Both match the final build. See templates for a data management plan and data validation plan.

Query process agreed

Who answers, who closes, and the time targets. See query management.

Monitoring approach set

Source data verification fields chosen, monitoring visit plan and remote review schedule agreed.

Test data separated from live data

Decide in advance how sandbox data is kept apart from live data, and confirm the handling with support. Do not assume test data carries over.

Hosting region confirmed

EU (Frankfurt) or USA (N. Virginia) matches the privacy notice and contracts.

Archive plan agreed

Close-out exports and retention owner decided. See data archiving and retention.

Hypercare owner named

Someone reviews entries, queries and sign-in problems every working day for the first two weeks.

The decision

Go, conditional go or no-go: example criteria

Adapt the thresholds to your study and quality system. The point is to write them down before you need them.

CriterionEvidence to look atBlocks go-live?
Any open critical or major UAT defectDefect log with retest resultsYes
Consent version differs from the approved oneApproval letter against system textYes
No tested route for serious adverse eventsEnd-to-end test recordYes
A site has no trained, delegated userDelegation log and training recordYes for that site only
Minor wording or label issue on a non-critical formDefect logNo; fix with a controlled change
Statistician has not reviewed the exportReview noteConditional: review within the first two weeks

Record the decision, date, attendees and any conditions with the checklist as part of the study file.

The sequence

From T-14 days to T+14 days

  1. 1

    T-14: freeze the build

    Forms approved, schedule locked, role matrix final. Further changes need change control.

  2. 2

    T-10: site rehearsals

    Each site completes a sandbox journey and gives feedback while it is cheap to act.

  3. 3

    T-7: accounts and access

    Create users, enable two-factor authentication, check delegation logs, issue enrolment links or QR codes.

  4. 4

    T-3: evidence review

    Collect the checklist evidence and resolve open items. Prepare the blank eCRF PDF for the study files.

  5. 5

    T-1: go/no-go meeting

    Decide, record, and tell sites. No build changes after the decision except through change control.

  6. 6

    T0: first participant

    Support is on hand, the hypercare owner watches the first entries and the first signed consent is checked.

  7. 7

    T+14: hypercare review

    Review queries, entry patterns, sign-in issues and open items. Close hypercare or extend it, and record the outcome.

After launch

What to watch in the first two weeks

The first fortnight is where assumptions meet reality. Watch the volume and type of auto-queries: a flood from one rule suggests a range is wrong, not that sites are careless. Watch entry timeliness against the visit window. Check that every signed consent has a countersignature and a matching version. Review user sign-in problems and fix them the same day, since a blocked site coordinator quickly resorts to paper.

Keep a simple log of every issue, the cause and the fix, and decide whether each needs a controlled change to the build. Capture's forms move through draft and approved states, and the field-level audit trail records changes with timestamp, user, old value, new value and reason, so a change made in week one is explained in the record. For a deeper look at preparing for inspection, see the FDA inspection checklist for clinical trial data.

Capture provides 21 CFR Part 11-aligned controls. Validated use, your SOPs and the go/no-go decision belong to the sponsor. This checklist is a general aid, not a regulatory document.

FAQ

Questions teams ask before they switch

Something not covered here? Ask us directly.

What is the difference between UAT and go-live?

UAT tests that the database meets its specification. The go-live gate also checks people, sites, consent, safety routes, documents and support, and records a decision. See the EDC UAT guide for testing.

Who should approve go-live?

Usually the study lead or sponsor representative together with the data manager, with input from the medical monitor and QA where you have them. Name the approvers in advance.

How long before the first participant should we run the checklist?

Start two weeks ahead so there is time for site rehearsals, then hold the decision meeting about a day before. Adjust to the size of your study.

Can we change the forms after go-live?

Yes, through change control: request, assess, test in the sandbox, approve and publish a new approved version. In Capture forms move from draft to approved with an audit trail.

Can we test everything before paying?

Yes. The Capture sandbox has every feature, no credit card and no time limit. You pay when you go live with real participants.

Do we need a hypercare period?

It is good practice. A named person reviewing entries, queries and access problems daily for two weeks catches issues while they are small.

Does this replace our SOPs?

No. It is a general aid. Follow your quality system and regulatory requirements.