Screen failure rate calculator: how many to screen for your target

Two formulas do the work. The screen failure rate is screen failures divided by people screened. The number to screen is your randomised target divided by one minus that rate. This page gives both, a table of rates, worked examples and a note on how uncertain a rate from a few dozen people is.

  • Two formulas, checked
  • Worked examples and rate table
  • Interval around an observed rate

Free sandbox · No credit card · 21 CFR Part 11 aligned

Screening funnel · demo study

Screened

140

Screen failures

42

Screen-fail rate

30.0%

Randomised

98

Screened (consented)140/140

100%

Randomised98/140

70.0%

Screen failures42/140

30.0%

Demo numbers. 42 / 140 = 30.0%. To randomise 120 at 30% you screen 120 / 0.70 = 171.4, so 172.

The formulas in one place

  • Screen-fail rate = screen failures / participants screened. Both numbers must count the same people, so write the definition down before you start.
  • Number to screen = randomised target / (1 - screen-fail rate). Round up. Screening 172 people for a target of 120 at a 30% rate, not 156.
  • The common mistake is multiplying instead of dividing. 120 x 1.30 = 156 screens only 109 people through at 30% failure. Dividing by 0.70 is correct, because the failures are a share of the screened, not a share of the randomised.
  • A rate from a small number is a wide range. 6 failures in 20 screened is 30%, but the interval around it runs from about 15% to about 52%. Plan with a range, not a point.
  • Benchmarks are indication-specific. This page gives no universal percentage. Use your own site feasibility data, previous studies and the strictness of your criteria.

Define it first

What counts as a screen failure

The arithmetic is trivial. The disagreement is almost always about the two inputs. A screen failure is commonly a person who signed consent and started screening procedures but was not randomised or enrolled, whether because a criterion was not met, a test came back out of range, or they withdrew before the end of screening. People who were only pre-screened and never consented are usually not counted, because they never entered the study record. Your protocol may define it differently, and that definition wins. The point is to pick one, put it in the statistical or operations plan, and apply it at every site.

The denominator needs the same discipline. If someone is screened twice, are they one screened participant or two? If a participant fails, is re-screened and then randomised, do you count one failure and one success, or only the success? A screening and enrollment log that records every screening attempt with a reason for each failure makes these choices explicit. Whatever you decide, apply it consistently, because the same data can yield a rate of 30.0% or 32.3% depending on whether 10 re-screens are counted as extra screenings (42 failures over 140 attempts, or over 130 distinct people).

Screen failure is not dropout

A screen failure leaves before randomisation. A dropout leaves after. They are planned separately: screen failures inflate how many you must screen, dropouts inflate how many you must randomise. The sibling tool is the dropout-adjusted sample size calculator. Do both adjustments in the right order: dropout first to get the randomised target, then screen failure to get the number to screen.

How to calculate

The calculation in five steps

Use a calculator or a spreadsheet. Every example below was checked numerically.

  1. 1

    Fix the definition

    Write who counts as screened and who counts as a screen failure. Decide how re-screens are handled.

  2. 2

    Compute the observed rate

    Screen failures divided by screened. Example: 42 / 140 = 0.30, or 30.0%. Keep the raw counts next to the percentage.

  3. 3

    Start from the randomised target

    This is the sample size after any dropout inflation. Example: 120 participants to randomise.

  4. 4

    Divide by one minus the rate

    120 / (1 - 0.30) = 120 / 0.70 = 171.4. Round up to 172. Never round down: you would end up short.

  5. 5

    Split across sites and add a range

    Across five sites that is 34.4 per site, so about 35. Repeat the calculation at a lower and higher rate to see how sensitive the plan is, as the table below shows.

Rate table

How many to screen for 100 randomised, by screen-fail rate

Number to screen = 100 / (1 - rate), rounded up. The right-hand column shows the extra people screened who will not be randomised.

Screen-fail rateDivide byExact number to screenRound upFailures to expect
10%0.90111.111212
20%0.80125.012525
30%0.70142.914343
40%0.60166.716767
50%0.50200.0200100

The effect is not linear. Going from 20% to 30% adds 18 people to screen; going from 40% to 50% adds 33. A strict criterion that doubles the failure rate costs more than it appears to at first glance.

Worked examples

Four situations, with the arithmetic

SituationInputsCalculationResult
Observed rate from a screening log42 failures, 140 screened42 / 14030.0% screen-fail rate; 98 randomised
Plan from an assumed rateTarget 120 randomised, assume 20%120 / 0.80150 to screen
Same plan, the rate comes in higherTarget 120, observed 30%120 / 0.70 = 171.4172 to screen; 22 more than planned
Smaller studyTarget 60, assume 35%60 / 0.65 = 92.393 to screen

The third row is the practical lesson: a 10-point miss in the assumed rate adds 22 screenings to a 120-participant study, which at a few screenings per site per month can mean extra months or extra sites.

Uncertainty

How much to trust an observed rate

A rate observed on 20 or 60 screened people is a noisy estimate. A simple way to see how noisy is to put an interval around it. One standard choice for a proportion is the Wilson score interval. For the same observed 30%, the 95% interval is wide at small numbers and narrows as screenings accumulate: 6 of 20 gives roughly 15% to 52%; 18 of 60 gives roughly 20% to 43%; 24 of 80 gives roughly 21% to 41%; 180 of 600 gives roughly 26% to 34%.

Use this when reviewing early data. If your plan assumed 20% and your first 60 screenings show 30% with an interval of 20% to 43%, the plan is not yet contradicted, but the upper end deserves a contingency: at 43% you would need 120 / 0.57 = 211 screenings, not 150. A statistician may prefer a different interval method, such as an exact one; the principle is the same. Report the count alongside the percentage so that readers can judge.

Log every screening attempt with a structured reason

The eligibility eCRF records each criterion and a screen-failure reason, so the rate and its causes come from the same data. Free sandbox, every feature, no credit card.

Start free

Use the result

Reading the reasons: where a high rate comes from

The rate tells you how many, the reasons tell you why. Group failures by criterion. In most programmes a small number of criteria account for most failures, often a laboratory threshold, a washout period or a comorbidity that is more common than the protocol writers assumed. If one exclusion criterion accounts for a large share of failures, ask three questions: could sites check it earlier through pre-screening, is the threshold clinically necessary, and is it worded so that sites apply it the same way? Changing a criterion needs a protocol amendment and ethics approval, so find out early rather than late.

Two other levers are cheaper. First, move the high-failure checks earlier in the visit so that fewer procedures are done on people who will fail. Second, make the criteria testable at pre-screening from a medical record, which keeps non-consented failures out of the study denominator and out of the burden on participants. To turn the rate and the screening pace into a calendar date, use the enrollment forecast calculator; to write the plan around it, use the recruitment plan template.

Quality check

Before you trust the number

One written definition

Screen failure and screened are defined once, in the plan, and applied the same way at every site.

Re-screens counted consistently

You know whether a re-screen is a new screening attempt or the same person.

Reasons recorded per criterion

Each failure has one structured reason code, plus a free-text field for detail.

Target already includes dropout

The randomised target is after dropout inflation, not before.

Rounded up

Every result is rounded up to a whole person, and per-site numbers likewise.

Sensitivity range

You have recalculated at a lower and higher rate and agreed a trigger for acting.

Counts shown with the percentage

Reports show 42 / 140, not only 30%.

In Capture

Screening data that reports itself

The eligibility screening eCRF has one question per inclusion and exclusion criterion, an investigator confirmation with a re-authenticated electronic signature, and a structured screen-failure reason. Because the reasons are coded fields in the study record and not free text in a spreadsheet, the counts behind your rate come from the same audit-trailed data as everything else. Capture covers Phase 1 through Phase 3 studies, and you can test the form in the free sandbox with sample participants.

  • Screening log fields with structured failure reasons.
  • Edit checks raise a query when an inclusion is not met or an exclusion is present.
  • Field-level audit trail on every screening record.
  • CSV or Excel export with a data dictionary for your own analysis.
Screening and enrollment log template
Screening log · demo site 003

Screened

12

Failed

4

  • 003-001 · Randomised
  • 003-004 · Screen failureExclusion 4: eGFR below threshold
  • 003-007 · Screen failureInclusion 2: not met
  • 003-011 · Screening in progress
Demo data. Reasons are fields, so they can be counted.

FAQ

Questions teams ask before they switch

Something not covered here? Ask us directly.

How do you calculate the screen failure rate?

Divide the number of screen failures by the number of participants screened and multiply by 100. For example, 42 failures out of 140 screened is 42 / 140 = 30.0%. Define both counts in your plan first.

How many patients do I need to screen to randomise 100?

Divide 100 by one minus the screen-fail rate and round up. At 20% that is 100 / 0.80 = 125, at 30% it is 143 and at 40% it is 167.

Why divide by (1 - rate) instead of multiplying by (1 + rate)?

The screen-fail rate is a share of the people screened, not of the people randomised. If 30% of those screened fail, 70% pass, so the number screened is the target divided by 0.70. Multiplying by 1.30 under-counts.

What is a normal screen failure rate?

There is no universal figure. It varies with indication, phase, the number of laboratory-based criteria and site pre-screening. Use your own previous studies and site feasibility data rather than a generic benchmark.

Are pre-screen failures counted as screen failures?

Often not, because they were never consented and never entered the study record, but it depends on the protocol definition. Track pre-screening separately so you can see both numbers.

How does screen failure relate to dropout?

Screen failures leave before randomisation and inflate how many you must screen. Dropouts leave after and inflate how many you must randomise. Apply dropout first, then screen failure.

How uncertain is a screen failure rate from a small sample?

Very. 6 failures out of 20 gives 30%, but a 95% Wilson interval runs from roughly 15% to 52%. At 180 of 600 the interval narrows to roughly 26% to 34%. Plan with a range.

How do I turn the number to screen into a timeline?

Divide the number to screen by the screening rate per site per month and the number of active sites, then allow for site activation. The enrollment forecast calculator does this.

Capture screening data from day one

Free sandbox with every feature. No credit card, and you pay only when you go live with real participants.