A CAPA log tracks every issue big enough to need a fix to its cause, not just a fix to the record. This template gives you the columns, the difference between correction, corrective and preventive action, two root cause methods and an effectiveness check that actually measures something.
Free sandbox · No credit card · 21 CFR Part 11 compliant
Problem and cause
Problem statement
Root cause method
Root cause category
Actions
Corrective action
Preventive action
Due date
Effectiveness criterion
Check due 15 Mar 2027
Key points
Definition
The CAPA concept comes from quality systems in manufacturing and was adopted by clinical research as risk-based quality management grew. A CAPA log is the register of every CAPA opened at a site, a sponsor or a CRO: what triggered it, what the cause was, what was done, and whether it worked. It is not a to-do list for every small fix. A misspelled date corrected by the coordinator is a correction, logged where the data lives, with a reason in the audit trail.
An issue belongs on the CAPA log when one of these is true: it is an important deviation or possible serious breach; the same thing has happened more than once (a common rule is three times in a set period); a monitor, auditor or inspector raised it as a finding that needs a response; or a KRI or QTL crossed its limit (see the quality tolerance limits guide). Your SOP should list the triggers so the decision does not depend on who is on duty. The SOP templates pack includes a CAPA SOP outline.
Sponsors and sites can each keep their own CAPA log. When a sponsor finding leads to a site action, both logs reference the same number so the trail can be followed in either direction. If your deviations already live in a system, as described in protocol deviation tracking software, record the CAPA reference on the deviation record too.
The template
Copy the first column as your header row. One CAPA per row; one CAPA can close several source issues.
| Column | What to enter | Example |
|---|---|---|
| 1. CAPA ID | Running number. | CAPA-007 |
| 2. Date opened | Date the CAPA was raised. | 06 Nov 2026 |
| 3. Source | What triggered it, with references. | Deviations PD-003-012, -014, -016 |
| 4. Scope | Site, study, process or system affected. | Site 003, visit scheduling |
| 5. Problem statement | What, where, when, how many. Facts and numbers. | 3 window deviations in 30 days |
| 6. Immediate correction | What was done to contain the instance. | Visits rebooked; participants contacted |
| 7. Root cause method | 5 whys, fishbone, or other. | 5 whys |
| 8. Root cause | The cause that, if removed, stops recurrence. | Scheduling call does not ask about travel |
| 9. Corrective action | Change that removes the cause where it happened. | Add travel question to scheduling call script |
| 10. Preventive action | Change that stops it happening elsewhere. | Add the step to the study scheduling SOP for all sites |
| 11. Owner | One named role per action. | Site coordinator lead; study manager |
| 12. Due date | Per action. | 15 Dec 2026 |
| 13. Effectiveness criterion | Measurable result that shows the cause is gone, and when it is checked. | 0 window deviations in next 20 visits; check 15 Mar 2027 |
| 14. Effectiveness result | What the check found, and who checked. | Met: 0 in 24 visits; QA, 16 Mar 2027 |
| 15. Status and closure | Open, actions done, effectiveness pending, closed; closure signature and date. | Closed, QA, 16 Mar 2027 |
Some organisations add a risk rating column (low, medium, high) to set deadlines. Keep it if your SOP uses one.
The distinction that matters
| Situation | Correction | Corrective action | Preventive action |
|---|---|---|---|
| Consent signed on an outdated version | Re-consent the participant on the current version. | Remove old versions from the consent desk; single current-version folder. | Version check added to the consent SOP for all studies. |
| Lab sample processed outside the protocol time | Record the deviation; flag the result. | Move centrifuge step before visit paperwork in the visit flow. | Visit flow checklist reviewed at every new study start-up. |
| eCRF entries late at one site | Enter the backlog. | Block weekly data entry time in the coordinator schedule. | Data entry lag KRI added to the monitoring plan for all sites. |
| Delegated task done by untrained staff | Stop the task; train; record the deviation. | Delegation not countersigned until training log shows completion. | Same gate added to site start-up checklist. |
If the preventive column is empty, ask whether the same cause exists anywhere else. It usually does.
Root cause
5 whys. Ask why the problem happened, then why that happened, until you reach something the organisation can change. Stop when the answer is a process, a tool or a missing control, not a person. Worked example for CAPA-007: Why were three visits out of window? Because participants were away on the planned day. Why was that not known? Because the scheduling call did not ask about travel. Why not? Because the script was copied from a study with weekly visits, where it did not matter. Why was it not adapted? Because nobody reviews site scripts against the visit schedule at start-up. The root cause is the missing start-up review, and the corrective action is a script change plus a start-up check.
Fishbone (Ishikawa). Draw the problem as the head and list possible causes under fixed categories: people, process, materials, systems, environment and communication. It is better than 5 whys when several causes contribute, such as a dosing error with a confusing label, a busy clinic and an unclear pharmacy manual. Pick the causes with evidence behind them, not every idea on the diagram.
Whichever method you use, write the root cause as a sentence that someone could disagree with. “Human error” cannot be disagreed with, so it explains nothing. If the cause is genuinely not established, say so and set a date to revisit it.
Three visits out of window
Problem with numbers
Participants away on visit day
Why 1
Scheduling call did not ask about travel
Why 2
Script copied from a weekly-visit study
Why 3
No start-up review of site scripts
Root cause: a missing control
Effectiveness checks
The check is planned when the CAPA opens, not when someone remembers to close it. It needs a metric, a target, a time window and a person.
| Weak criterion | Strong criterion |
|---|---|
| Staff retrained. | No consent version errors in the next 30 consents, checked by the monitor at the next two visits. |
| Process updated. | Median data entry lag at Site 003 at or below 5 days for two consecutive months. |
| Monitor to follow up. | Zero repeat findings of the same category at the next interim visit, recorded in the visit report. |
| Issue resolved. | Window deviations fall below 2% of visits for the quarter after implementation, from the deviation log. |
If the check fails, the CAPA reopens with a new root cause analysis. A failed check is useful information, not a failure of the log.
In the free sandbox you can record a deviation with its root cause and CAPA, mark the CAPA complete and see the deviation stay open until it is.
In Capture
With the CTMS module on, a protocol deviation in Capture carries its root cause, impact and CAPA on the same record. The sponsor team marks whether CAPA is required before closing, the site records CAPA Completed when the actions are done, and closing is blocked until the deviation is classified, the root cause is recorded, any required CAPA is complete and the investigator has reviewed it. Action items track follow-ups by category (documentation, training, enrollment, data quality, regulatory, other) with an owner, a priority and a due date.
Weight changed 68.0 to 68.5 kg
Site coordinator · Reason: Transcription error
Query Q-0014 answered on Weight
Site coordinator · Reason: Source checked
Vital signs form locked
Data manager · Reason: Visit cleaned
Lifecycle
Record the source issue references and write the problem statement with facts and counts.
Do the correction first. Protect participants and data before analysing anything.
Use 5 whys or a fishbone with the people who do the work. Record the method and the evidence.
Corrective and preventive actions, each with an owner and date, plus the effectiveness criterion and when it is measured.
Attach evidence: the changed SOP version, the updated script, the training record in the training log.
Measure against the criterion. Close with a signature if met; reopen with a new analysis if not.
Quality check
How many, where, over what period.
Not “human error” and not the problem restated.
Each in its own column.
A role or a named person, never “team”.
Metric, target, window, checker.
SOP version, training record, changed form.
Monthly by QA or the study manager.
Deviation and audit findings point to the CAPA and back.
It is the register of corrective and preventive actions opened at a site, sponsor or CRO: the triggering issue, the root cause, the actions with owners and dates, and the effectiveness check that shows whether the cause was removed.
A corrective action removes the cause of a problem that has happened so it does not recur. A preventive action removes the cause of a potential problem before it happens, often at other sites or in other studies. A correction just fixes the instance.
Common triggers are an important deviation, a possible serious breach, a repeat of the same deviation category, an audit or inspection finding, or a KRI or QTL crossing its limit. Your SOP should list the triggers.
Sometimes, when the cause really is a knowledge gap. If the cause is a process, a tool or a form, retraining alone usually fails the effectiveness check. Fix the process and train on the change.
ICH E6(R2) 5.20.1 asks the sponsor to perform a root cause analysis and implement corrective and preventive actions when significant noncompliance is found. E6(R3) keeps the expectation within its quality management approach; check the current text.
Until the effectiveness check is met. Actions often take weeks; the check may need a few months of data. Track due dates and review overdue CAPAs monthly.
Capture records root cause and CAPA on each protocol deviation in the CTMS module and blocks closing until any required CAPA is complete. Follow-ups can be tracked as action items. A CAPA that is not linked to a deviation is kept in your own CAPA log.
Keep exploring
Protocol deviation log template
Where most CAPAs start.
Protocol deviation tracking software
Deviations tied to data.
Risk-based quality management guide
The wider quality loop.
SOP templates pack
Including a CAPA SOP outline.
Software for quality assurance
QA oversight in one system.
FDA inspection checklist
What inspectors ask for.
Try root cause and CAPA tracking on a sample study. Free sandbox, no credit card.