Count the forms, fields, edit checks, visits, sites and records, enter your own effort assumptions and hourly rates, and get the one-off cost of moving a study or a portfolio between data capture systems, line by line with the formula shown.
Free sandbox · No credit card · 21 CFR Part 11 compliant
Estimated total
$30,101
Staff hours
352
Largest line
UAT + validation
Historical data
Archived
184 h
78 h
48 h
42 h
EDC migration cost in brief
Free tool
The example is an invented 25-form study with 120 edit checks, 12 visits and 8 sites, keeping the old data as an archive. Change the scope, the approach to historical data and every assumption. Nothing is saved or sent.
Every default below is an editable placeholder chosen to show the arithmetic. None is a benchmark or a vendor price. Replace them with your own counts, your own timed sample (build one form and time it) and your own staff rates.
Build-type lines count in full for the first study and at 50% for each further study (1.00 study-equivalents in total). A planning aid, not a quote. Runs in your browser; nothing is stored or sent.
The formula
The model is a sum of work packages. Each one is a count from your study, multiplied by an effort assumption, multiplied by the hourly rate of the role that does the work. Cash items you pay to someone else, such as the old system’s monthly fee while both run, are added at face value, and a contingency percentage goes on top:
Total = (Σ count × effort × role rate + cash items) × (1 + contingency).
In the demo, rebuilding forms is 25 forms × 20 fields × 4 minutes ÷ 60 = 33.3 hours, which at a study builder rate of 75 per hour is 2,500. Mapping is 500 variables × 5 minutes ÷ 60 = 41.7 hours of data programming at 90, which is 3,750. User acceptance testing is 25 forms × 1.5 hours = 37.5 hours, plus 40 hours of validation documents, at a QA rate of 80: 6,200. Site retraining is 8 sites × 3 people × 2 hours = 48 hours at a site rate of 50, plus 16 hours of trainer time. Add the edit checks (40 hours), the visit schedule (6 hours), the build specification (25 hours), two months of parallel running (40 hours) and the archive (24 hours), and the labour comes to 351.5 hours and 26,175. With 15% contingency the total is 30,101.
For more than one study, build-type work (specifications, forms, edit checks, the schedule and per-form testing) counts in full for the first study and at (100% − reuse%) for every further study. Data-type work (mapping, transfer, reconciliation, training, parallel running and the archive) counts in full per study, because each study has its own data and its own sites. Validation documents are counted once for the migration as a whole.
Published effort figures for database builds vary enormously with form complexity, the number of cross-form checks and how well the original specification was kept. A number from another team would look precise and mislead. The fastest way to a defensible assumption is to rebuild one typical form, one complex form and ten edit checks yourself, time them, and enter those times. The free sandbox exists for exactly this kind of test.
Work packages
Use this as a checklist when you read a migration proposal. If a line is missing from a quote, ask who is doing that work and at what cost.
| Line | Counted as | What the work includes | Who usually does it |
|---|---|---|---|
| Build specification | Forms × hours per form | Reading the old form definitions, annotated CRF and data dictionary; deciding what changes; writing the spec for the new build | Data manager |
| Form rebuild | Forms × fields × minutes per field | Questions, types, units, ranges, required flags, answer codes, skip logic, calculated fields | Study builder |
| Edit checks | Checks × minutes per check | Rewriting each check in the new system’s rules and testing it fires on bad data and stays quiet on good data | Study builder |
| Visit schedule | Visits × hours per visit | Visits, windows, anchors and which forms belong to which visit | Study builder |
| Variable mapping | Variables × minutes per variable | A table from every old variable and code to the new one, needed whether you load the data or merge at analysis | Data programmer |
| Data transfer | Programming hours, or records × minutes | Writing and testing a load, or re-keying records by hand; nothing if you archive and merge later | Programmer or site staff |
| Reconciliation | Records × sample % × minutes | Comparing moved records against the source and resolving differences | Data manager |
| UAT and validation | Forms × hours, plus fixed document hours | Test scripts, execution evidence, a validation plan and report for the new build | QA / validation |
| Retraining | Sites × staff × hours, plus trainer time | Teaching every site user the new system, with time for questions in the first weeks | Sites and trainer |
| Parallel running | Months × oversight hours, plus old fees | Two systems live at once: queries closing in the old one while new data goes into the new one | Data manager |
| Archive | Hours, plus any exit charge | Exporting the complete old database with its audit trail, checking it opens and is complete, storing it for the retention period | Data manager |
The calculator rounds nothing until the final display. Hours are shown to one decimal place and money to the nearest whole unit.
Worked comparison
Same placeholder assumptions as the demo. The programmed load adds 40 hours of programming and a 10% reconciliation sample; re-keying assumes 6 minutes per record for 4,000 records plus the same sample.
| Scenario | Staff hours | Total with 15% contingency | What drives the difference |
|---|---|---|---|
| One study, archive old data and merge at analysis | 351.5 | $30,101 | Mapping is still needed for the merge; no transfer or reconciliation |
| One study, programmed load | 424.8 | $37,116 | 40 h programming plus 33.3 h reconciliation |
| One study, re-key historical records by hand | 784.8 | $55,976 | 400 h of site data entry for 4,000 records |
| Three similar studies, archive, 50% build reuse | 832.7 | $70,495 | Build and test counted 2 study-equivalents instead of 3 |
| Three similar studies, archive, no reuse | 974.5 | $82,944 | Each study rebuilt from scratch |
Computed with the calculator on this page. The ranking of the three approaches is what matters, not the amounts, which come from placeholders.
Historical data
The cheapest and often the cleanest approach is to stop entering data in the old system on a fixed cutover date, lock it, export the complete database with its audit trail, and merge old and new data at analysis through a documented mapping. The old audit trail stays intact as its own record, and nothing is copied twice. The guide to switching EDC vendors mid-study walks through the cutover, and switching CROs and data migration covers the handover package to demand from the outgoing party.
A programmed load makes sense when the new system must show each participant’s full history in one place, for example because site staff need earlier visits to enter later ones. It costs programming, testing and reconciliation, and the new audit trail starts at the load, not at original entry, so the old trail still has to be archived. Re-keying by hand is the most expensive option per record and the one most likely to introduce transcription errors; discuss it with quality assurance before you choose it.
Capture provides exports; it does not advertise an import tool for historical clinical data. If you need to load past records, ask us what is supported for your case before you plan around it. Whichever route you pick, keep the old system’s export in an open format with its audit trail. Exporting the audit trail for inspectors explains what a complete trail contains.
Rebuild one form and ten edit checks in the free sandbox, time them and put your own numbers into the calculator. No credit card, no time limit.
In Capture
The biggest build lines are forms and edit checks. Capture’s AI study builder reads a protocol (PDF, DOCX or DOC) and drafts the visit schedule and forms. Inside a draft form, Build with AI reads a form description or an uploaded file (CSV, XLSX, PDF or DOCX), such as a page of the old annotated CRF or a data dictionary extract, and drafts the questions or a lab table. Nothing is saved without your review, and AI only works on draft forms.
Question form
CRF or ePRO
Lab table
Analytes, units, ranges
1. Systolic blood pressure
Required · Number · mmHg · 0 dp
2. Diastolic blood pressure
Required · Number · mmHg · 0 dp
3. Pulse rate
Required · Number · beats/min
4. Body temperature
Required · Number · °C · 1 dp
5. Position during measurement
Required · Sitting, Supine, Standing
Test before you pay
The free sandbox lets you build the full study, enter sample data and test skip logic, edit checks, e-signatures and the audit trail before you commit. You pay only when you go live with real participants. That turns the UAT line from a cost you estimate into work you can rehearse.
Stage 1
DraftBuild and edit freely
Stage 2
ApprovedLocked for live use
Stage 3
In the casebookOnly approved forms
SDV requirement changed on Systolic BP
Data manager · Reason: critical safety value
Form approved: Vital Signs (VS) v2
Study owner · Locked for live use
Answer changed: Weight 68.0 to 68.5 kg
Site coordinator · Reason: transcription error
Method
Export the old data dictionary and annotated CRF. Count forms, fields, edit checks, visits and records directly from them. Recounting usually finds more checks than anyone remembered.
Rebuild one simple form, one complex form and ten edit checks in the target system. Divide by fields and checks to get your own minutes per field and per check.
Archive and merge, programmed load or re-key. Write down why. The choice changes the mapping, transfer and reconciliation lines and how inspectors will read the record.
Fix the last day of data entry in the old system, the first in the new one and how long both stay open for queries. That gives the parallel-running months.
Count the people who will enter data, not just the sites. Use how to train site staff on EDC for the session plan and proof of training.
Run a sample export from the new build and compare it with the mapping table. Capture’s exports are wide format, one row per submission, with an automatic data dictionary; the data dictionary and codebook generator shows what a good dictionary contains.
Before you sign off the budget
Forms, fields, checks and records counted from the exported dictionary and aCRF.
Minutes per field and per check from a timed sample in the target system.
Archive, load or re-key, with the rationale written down.
Export formats, exit charges and read access after termination entered as cash items.
Test scripts per form and the validation plan and report counted.
Staff per site, not sites, multiplied by training hours.
The old database and its audit trail open, complete and stored for the retention period.
It depends on the number of forms, fields and edit checks, how many sites must be retrained, how long both systems run side by side and what you do with the historical data. The calculator multiplies each of those counts by your own effort assumptions and rates. With the placeholder numbers, a 25-form, 8-site study comes to about 350 staff hours when the old data is archived; with your numbers it will differ.
Archiving and merging at analysis is usually the smallest option, because there is no transfer or reconciliation work and the old audit trail stays intact. A programmed load adds programming and reconciliation; re-keying by hand adds the most. The worked comparison on this page shows the difference on the same study.
Capture provides exports; this page does not claim an import tool for historical clinical data. Most teams archive the old database with its audit trail and merge at analysis. If you need to load past records, ask us what is supported before you plan around it.
Capture’s AI study builder drafts visits and forms from a protocol, and Build with AI drafts questions or a lab table from a description or an uploaded CSV, XLSX, PDF or DOCX file. Every draft has to be reviewed. The calculator does not assume a saving: time a rebuild in the sandbox and enter your own minutes per field.
A rebuilt database is a new configuration. Each form, edit check and visit needs testing with evidence, and the work needs a validation plan and report, before live data is entered. It is often the largest single line after the rebuild itself.
It does not move. The old system’s audit trail has to be exported and archived with the old data for the retention period, and the new system starts its own trail from the cutover or the load.
No. The calculator runs in your browser; nothing is saved or sent. Use Copy estimate as text to keep a record.
Keep exploring
How to switch EDC vendors mid-study
Cutover, archive and the decision to switch.
Switching CROs: data migration
The handover package to demand.
EDC cost calculator
How typical EDC quotes are built.
Clinical trial software cost estimator
Capture estimate from public prices.
EDC UAT sandbox environment
Testing the rebuild before go-live.
Upload the protocol, let AI draft the visits and forms, test edit checks and exports with sample data, and pay only when you go live.