Free tool · PlanningUpdated November 25, 2026

EDC migration cost calculator: what moving a study really takes

Count the forms, fields, edit checks, visits, sites and records, enter your own effort assumptions and hourly rates, and get the one-off cost of moving a study or a portfolio between data capture systems, line by line with the formula shown.

  • Every line shows its formula
  • Archive, load or re-key compared
  • Portfolio reuse built in
  • Nothing stored

Free sandbox · No credit card · 21 CFR Part 11 compliant

  • ISO 27001 certified
  • 21 CFR Part 11 compliant
  • GDPR compliant
  • EU and US data hosting
  • HIPAA compliant
  • ICH GCP E6(R3) compliant
Demo · 25 forms, 120 edit checks, 8 sites, old data archived (placeholder assumptions)

Estimated total

$30,101

Staff hours

352

Largest line

UAT + validation

Historical data

Archived

Data manager / study builder184/200

184 h

Validation / QA78/200

78 h

Site staff retraining48/200

48 h

Data programmer (mapping)42/200

42 h

Illustrative placeholders, not benchmarks. Replace every number with your own.

EDC migration cost in brief

  • The licence is rarely the big number. The one-off cost of a migration is mostly staff time: rebuilding forms and edit checks, mapping variables, testing, retraining sites, running two systems side by side and archiving the old database.
  • What you do with historical data decides the size of the bill. Archiving the old data and merging at analysis is the smallest option; a programmed load adds programming and reconciliation; re-entering records by hand is usually the largest and breaks the original audit history.
  • Validation and UAT are not optional extras. Every rebuilt form and edit check has to be tested and documented before live data goes in. Budget for it explicitly.
  • A portfolio is cheaper per study. Once the first study is rebuilt, later studies with the same forms reuse much of the build and test work. The calculator models this with a reuse percentage you set.
  • The calculator holds no benchmarks. Every default is a placeholder. Time one representative form in a sandbox and use that, not someone else’s average.

Free tool

Estimate the cost of moving your study

The example is an invented 25-form study with 120 edit checks, 12 visits and 8 sites, keeping the old data as an archive. Change the scope, the approach to historical data and every assumption. Nothing is saved or sent.

Every default below is an editable placeholder chosen to show the arithmetic. None is a benchmark or a vendor price. Replace them with your own counts, your own timed sample (build one form and time it) and your own staff rates.

Study scope

Similar studies in this migration

%

Share of build and test work you can copy to each further study

Historical data

What happens to records already entered in the old system.

Effort assumptions (editable)

Placeholders. Time a sample of your own work and enter the result.

h
min
min
h
min
h
h
h
h
h
h
Rates and contract items
/h
/h
/h
/h

From your current contract; 0 if none

From your contract; 0 if none

%
Estimated total
$30,101
incl. 15% contingency
Staff hours
352
about 47 person-days
Per study
$30,101
1 study

Line by line, with the formula

  • Compare old form definitions and write the build spec$1,875
    25 forms × 1 h = 25.0 h × data manager / study builder rate
  • Rebuild forms and fields$2,500
    25 forms × 20 fields × 4 min ÷ 60 = 33.3 h × data manager / study builder rate
  • Rebuild and unit-test edit checks$3,000
    120 checks × 20 min ÷ 60 = 40.0 h × data manager / study builder rate
  • Rebuild the visit schedule and form assignments$450
    12 visits × 0.5 h = 6.0 h × data manager / study builder rate
  • Map old variables and codes to the new data dictionary$3,750
    500 variables × 5 min ÷ 60 = 41.7 h × data programmer rate
  • User acceptance testing of forms, checks and schedule$3,000
    25 forms × 1.5 h = 37.5 h × validation / qa rate
  • Validation plan, test summary and report (once)$3,200
    40 h, counted once = 40.0 h × validation / qa rate
  • Site staff retraining time$2,400
    8 sites × 3 staff × 2 h = 48.0 h × site staff rate
  • Trainer and support time$1,200
    8 sites × 2 h = 16.0 h × data manager / study builder rate
  • Parallel running and cutover oversight$3,000
    2 months × 20 h = 40.0 h × data manager / study builder rate
  • Export, check and archive the old database with its audit trail$1,800
    24 h = 24.0 h × data manager / study builder rate
  • Old system fees while both run$0
    2 months × fee per month from your contract
  • Old vendor export or exit charges$0
    from your contract
  • Subtotal$26,175
  • Contingency 15%$3,926
  • Total$30,101

Hours by role

Data manager / study builder
184.3 h · $13,825
Data programmer
41.7 h · $3,750
Validation / QA
77.5 h · $6,200
Site staff
48.0 h · $2,400

Build-type lines count in full for the first study and at 50% for each further study (1.00 study-equivalents in total). A planning aid, not a quote. Runs in your browser; nothing is stored or sent.

The formula

How the estimate is built

The model is a sum of work packages. Each one is a count from your study, multiplied by an effort assumption, multiplied by the hourly rate of the role that does the work. Cash items you pay to someone else, such as the old system’s monthly fee while both run, are added at face value, and a contingency percentage goes on top:

Total = (Σ count × effort × role rate + cash items) × (1 + contingency).

In the demo, rebuilding forms is 25 forms × 20 fields × 4 minutes ÷ 60 = 33.3 hours, which at a study builder rate of 75 per hour is 2,500. Mapping is 500 variables × 5 minutes ÷ 60 = 41.7 hours of data programming at 90, which is 3,750. User acceptance testing is 25 forms × 1.5 hours = 37.5 hours, plus 40 hours of validation documents, at a QA rate of 80: 6,200. Site retraining is 8 sites × 3 people × 2 hours = 48 hours at a site rate of 50, plus 16 hours of trainer time. Add the edit checks (40 hours), the visit schedule (6 hours), the build specification (25 hours), two months of parallel running (40 hours) and the archive (24 hours), and the labour comes to 351.5 hours and 26,175. With 15% contingency the total is 30,101.

For more than one study, build-type work (specifications, forms, edit checks, the schedule and per-form testing) counts in full for the first study and at (100% − reuse%) for every further study. Data-type work (mapping, transfer, reconciliation, training, parallel running and the archive) counts in full per study, because each study has its own data and its own sites. Validation documents are counted once for the migration as a whole.

Why the defaults are placeholders

Published effort figures for database builds vary enormously with form complexity, the number of cross-form checks and how well the original specification was kept. A number from another team would look precise and mislead. The fastest way to a defensible assumption is to rebuild one typical form, one complex form and ten edit checks yourself, time them, and enter those times. The free sandbox exists for exactly this kind of test.

Work packages

Every line in the calculator, and what it covers

Use this as a checklist when you read a migration proposal. If a line is missing from a quote, ask who is doing that work and at what cost.

LineCounted asWhat the work includesWho usually does it
Build specificationForms × hours per formReading the old form definitions, annotated CRF and data dictionary; deciding what changes; writing the spec for the new buildData manager
Form rebuildForms × fields × minutes per fieldQuestions, types, units, ranges, required flags, answer codes, skip logic, calculated fieldsStudy builder
Edit checksChecks × minutes per checkRewriting each check in the new system’s rules and testing it fires on bad data and stays quiet on good dataStudy builder
Visit scheduleVisits × hours per visitVisits, windows, anchors and which forms belong to which visitStudy builder
Variable mappingVariables × minutes per variableA table from every old variable and code to the new one, needed whether you load the data or merge at analysisData programmer
Data transferProgramming hours, or records × minutesWriting and testing a load, or re-keying records by hand; nothing if you archive and merge laterProgrammer or site staff
ReconciliationRecords × sample % × minutesComparing moved records against the source and resolving differencesData manager
UAT and validationForms × hours, plus fixed document hoursTest scripts, execution evidence, a validation plan and report for the new buildQA / validation
RetrainingSites × staff × hours, plus trainer timeTeaching every site user the new system, with time for questions in the first weeksSites and trainer
Parallel runningMonths × oversight hours, plus old feesTwo systems live at once: queries closing in the old one while new data goes into the new oneData manager
ArchiveHours, plus any exit chargeExporting the complete old database with its audit trail, checking it opens and is complete, storing it for the retention periodData manager

The calculator rounds nothing until the final display. Hours are shown to one decimal place and money to the nearest whole unit.

Worked comparison

How the approach to historical data changes the total

Same placeholder assumptions as the demo. The programmed load adds 40 hours of programming and a 10% reconciliation sample; re-keying assumes 6 minutes per record for 4,000 records plus the same sample.

ScenarioStaff hoursTotal with 15% contingencyWhat drives the difference
One study, archive old data and merge at analysis351.5$30,101Mapping is still needed for the merge; no transfer or reconciliation
One study, programmed load424.8$37,11640 h programming plus 33.3 h reconciliation
One study, re-key historical records by hand784.8$55,976400 h of site data entry for 4,000 records
Three similar studies, archive, 50% build reuse832.7$70,495Build and test counted 2 study-equivalents instead of 3
Three similar studies, archive, no reuse974.5$82,944Each study rebuilt from scratch

Computed with the calculator on this page. The ranking of the three approaches is what matters, not the amounts, which come from placeholders.

Historical data

Archive, load or re-key: choosing what happens to the old records

The cheapest and often the cleanest approach is to stop entering data in the old system on a fixed cutover date, lock it, export the complete database with its audit trail, and merge old and new data at analysis through a documented mapping. The old audit trail stays intact as its own record, and nothing is copied twice. The guide to switching EDC vendors mid-study walks through the cutover, and switching CROs and data migration covers the handover package to demand from the outgoing party.

A programmed load makes sense when the new system must show each participant’s full history in one place, for example because site staff need earlier visits to enter later ones. It costs programming, testing and reconciliation, and the new audit trail starts at the load, not at original entry, so the old trail still has to be archived. Re-keying by hand is the most expensive option per record and the one most likely to introduce transcription errors; discuss it with quality assurance before you choose it.

Capture provides exports; it does not advertise an import tool for historical clinical data. If you need to load past records, ask us what is supported for your case before you plan around it. Whichever route you pick, keep the old system’s export in an open format with its audit trail. Exporting the audit trail for inspectors explains what a complete trail contains.

Time your own rebuild instead of guessing

Rebuild one form and ten edit checks in the free sandbox, time them and put your own numbers into the calculator. No credit card, no time limit.

Rebuild a study free in the sandbox

In Capture

Draft the rebuild from documents you already have

The biggest build lines are forms and edit checks. Capture’s AI study builder reads a protocol (PDF, DOCX or DOC) and drafts the visit schedule and forms. Inside a draft form, Build with AI reads a form description or an uploaded file (CSV, XLSX, PDF or DOCX), such as a page of the old annotated CRF or a data dictionary extract, and drafts the questions or a lab table. Nothing is saved without your review, and AI only works on draft forms.

  • Lab tables drafted with analytes as rows and unit, result and reference range columns, split by sex and age where the source has them.
  • Edit checks with range high, range low and custom value rules raise a query automatically when a site enters a value that breaks a rule.
  • Forms move from draft to approved; only approved forms are locked for live use and appear in the casebook.
  • Time the work in the sandbox and feed the minutes per field into the calculator above.
Build a form with AI (help)
Build this form with AI

Question form

CRF or ePRO

Lab table

Analytes, units, ranges

Vital signs form: BP, pulse, temperature, respiratory rate, weight
Upload CSV, XLSX, PDF or DOCX
14 questionsReview before applying
  • 1. Systolic blood pressure

    Required · Number · mmHg · 0 dp

    Number
  • 2. Diastolic blood pressure

    Required · Number · mmHg · 0 dp

    Number
  • 3. Pulse rate

    Required · Number · beats/min

    Number
  • 4. Body temperature

    Required · Number · °C · 1 dp

    Number
  • 5. Position during measurement

    Required · Sitting, Supine, Standing

    Single choice
  • + 9 more questions
Back Apply to form

Test before you pay

UAT in a sandbox that has every feature

The free sandbox lets you build the full study, enter sample data and test skip logic, edit checks, e-signatures and the audit trail before you commit. You pay only when you go live with real participants. That turns the UAT line from a cost you estimate into work you can rehearse.

  • Blank eCRF PDF with a cover page, form index and visit-by-form matrix for ethics or IRB resubmission.
  • Annotated CRF with variable names, field types and codelists to check the mapping against.
  • Copy a finished study configuration (schedule, forms, logic and edit checks) into a new draft study for the next one in a portfolio; participants, data and the audit trail are never copied.
EDC UAT sandbox environment

Stage 1

Draft

Build and edit freely

Stage 2

Approved

Locked for live use

Stage 3

In the casebook

Only approved forms

Audit trail
  • SDV requirement changed on Systolic BP

    Data manager · Reason: critical safety value

  • Form approved: Vital Signs (VS) v2

    Study owner · Locked for live use

  • Answer changed: Weight 68.0 to 68.5 kg

    Site coordinator · Reason: transcription error

Method

Turning the estimate into a migration plan

  1. 1

    Count from the old system, not from memory

    Export the old data dictionary and annotated CRF. Count forms, fields, edit checks, visits and records directly from them. Recounting usually finds more checks than anyone remembered.

  2. 2

    Time a sample

    Rebuild one simple form, one complex form and ten edit checks in the target system. Divide by fields and checks to get your own minutes per field and per check.

  3. 3

    Decide the historical-data route

    Archive and merge, programmed load or re-key. Write down why. The choice changes the mapping, transfer and reconciliation lines and how inspectors will read the record.

  4. 4

    Agree the cutover date

    Fix the last day of data entry in the old system, the first in the new one and how long both stay open for queries. That gives the parallel-running months.

  5. 5

    Plan training per site

    Count the people who will enter data, not just the sites. Use how to train site staff on EDC for the session plan and proof of training.

  6. 6

    Check the export before go-live

    Run a sample export from the new build and compare it with the mapping table. Capture’s exports are wide format, one row per submission, with an automatic data dictionary; the data dictionary and codebook generator shows what a good dictionary contains.

Before you sign off the budget

EDC migration cost checks

Counts taken from documents

Forms, fields, checks and records counted from the exported dictionary and aCRF.

Effort timed, not borrowed

Minutes per field and per check from a timed sample in the target system.

Historical-data route agreed with QA

Archive, load or re-key, with the rationale written down.

Old contract read

Export formats, exit charges and read access after termination entered as cash items.

Validation scope fixed

Test scripts per form and the validation plan and report counted.

Everyone who enters data trained

Staff per site, not sites, multiplied by training hours.

Archive verified

The old database and its audit trail open, complete and stored for the retention period.

FAQ

Questions teams ask before they switch

Something not covered here? Ask us directly.

How much does it cost to migrate an EDC study?

It depends on the number of forms, fields and edit checks, how many sites must be retrained, how long both systems run side by side and what you do with the historical data. The calculator multiplies each of those counts by your own effort assumptions and rates. With the placeholder numbers, a 25-form, 8-site study comes to about 350 staff hours when the old data is archived; with your numbers it will differ.

Is it cheaper to archive old data or load it into the new EDC?

Archiving and merging at analysis is usually the smallest option, because there is no transfer or reconciliation work and the old audit trail stays intact. A programmed load adds programming and reconciliation; re-keying by hand adds the most. The worked comparison on this page shows the difference on the same study.

Does Capture import data from my current system?

Capture provides exports; this page does not claim an import tool for historical clinical data. Most teams archive the old database with its audit trail and merge at analysis. If you need to load past records, ask us what is supported before you plan around it.

Can AI reduce the form rebuild time?

Capture’s AI study builder drafts visits and forms from a protocol, and Build with AI drafts questions or a lab table from a description or an uploaded CSV, XLSX, PDF or DOCX file. Every draft has to be reviewed. The calculator does not assume a saving: time a rebuild in the sandbox and enter your own minutes per field.

Why is validation a separate line?

A rebuilt database is a new configuration. Each form, edit check and visit needs testing with evidence, and the work needs a validation plan and report, before live data is entered. It is often the largest single line after the rebuild itself.

What happens to the audit trail when we switch?

It does not move. The old system’s audit trail has to be exported and archived with the old data for the retention period, and the new system starts its own trail from the cutover or the load.

Is anything I enter stored?

No. The calculator runs in your browser; nothing is saved or sent. Use Copy estimate as text to keep a record.

Rebuild one study before you commit

Upload the protocol, let AI draft the visits and forms, test edit checks and exports with sample data, and pay only when you go live.

Rebuild a study free in the sandbox