Sponsor checklistUpdated October 14, 2026

EDC validation checklist for sponsors: from vendor assessment to go-live

Validation is the sponsor's responsibility even when the vendor supplies the software. This checklist follows the lifecycle in the order a small team actually does the work: assess, plan, configure, test, release, and keep it controlled.

  • Vendor evidence vs your own testing
  • UAT script outline
  • Change control after go-live

Free sandbox · No credit card · 21 CFR Part 11 aligned

EDC validation tracker (demo)

Study

DEMO-CARD-04

Risk level

Medium

Target go-live

Week 8

  • Vendor assessment and evidence package reviewedQA
  • Validation plan and risk assessment approvedv1.0
  • Study configuration specification signedData manager
  • UAT scripts executed: 38 of 46 passed2 deviations open
  • Audit trail export reviewed against sample editsRe-test
  • Validation summary reportAfter UAT
Demo tracker. Scope and depth follow your own risk assessment.

What this checklist is, and is not

  • Sponsor-side: it covers what the sponsor or a CRO acting for it should do to show that an EDC is fit for a specific study. It is not a vendor qualification report.
  • Risk-based: depth follows the risk to participant safety and data reliability. A simple observational study needs less than a pivotal trial.
  • Two parts: evidence the vendor supplies, and tests you run on your own configuration (UAT). You need both.
  • Controls to look for: an audit trail, e-signatures, role-based access, edit checks and change control. Capture provides Part 11-aligned controls; validated use stays shared with you.
  • Not legal advice: regulators and standards change. Confirm requirements with your quality and regulatory advisers.

Context

Why the sponsor, not the vendor, owns validation

Regulations and guidance on electronic systems in clinical investigations put responsibility for fitness for purpose on the sponsor. In the US, 21 CFR Part 11 asks that systems be validated to ensure accuracy, reliability and consistent intended performance, and the ICH GCP framework makes the sponsor responsible for systems used to handle trial data. European guidance on computerised systems and electronic data in clinical trials takes a similar line and expects documentation of the roles of each party. Read our EMA computerised systems guideline guide and the 21 CFR Part 11 compliance checklist for the regulatory detail.

That does not mean you rebuild the vendor's test suite. A well-run approach uses a risk-based, proportional lifecycle: understand what the system is meant to do for this study, collect the evidence the vendor already has, test the parts that are specific to your configuration, and document decisions. Frameworks such as GAMP 5 describe this approach in industry terms.

This page is the practical checklist for that approach. For the concepts behind it see computer system validation for clinical trial software, and for how to run the testing step see the EDC UAT sandbox guide. The in-study rules (what is checked on each field) belong in a data validation plan, which is a different document from the validation of the system itself.

Phase 1

Vendor assessment: what evidence to ask for

Do this before you commit. A questionnaire alone is not an audit, but it shows how seriously a vendor treats the topic.

Control set matches your needs

Field-level audit trail with old value, new value, user, timestamp and reason; e-signatures; role-based access; edit checks; controlled form states.

Vendor quality system

Ask how software is developed, tested and released, and how changes are communicated to customers.

Documentation for sponsor validation

Ask what documentation exists to support your validation. Capture enterprise customers receive documentation to support sponsor validation and UAT.

Security and hosting

Ask where data is hosted (Capture offers EU Frankfurt and USA N. Virginia) and how it is protected. Use the vendor security questionnaire as a starting list.

Support and incident handling

Ask about support channels, response time and how incidents are reported to customers.

Data export and exit

Confirm full export of data, the audit trail and a data dictionary, so the data is not trapped. See data ownership and portability.

Record the decision

Document what you reviewed, what gaps you found and why you accepted them.

Phase 2

Validation plan and risk assessment

A short plan, written before testing starts, beats a thick report written afterwards.

Intended use

State what the EDC will be used for in this study: data capture, queries, e-signatures, exports, randomization or ePRO if applicable.

Scope and responsibilities

List who does what: sponsor, CRO, vendor, sites. Name the approver.

Risk assessment

Rate functions by impact on participant safety and data reliability, and decide how deep to test each. Safety-critical calculations and blinded data deserve the most.

Test approach

Decide which functions you will test yourself and which you will rely on vendor evidence for, with a reason.

Acceptance criteria

Define pass/fail and how deviations are handled and closed.

Deliverables

Plan the configuration specification, UAT scripts and results, deviation log, and a validation summary report.

Phase 3 and 4

Configuration review and UAT: a script outline

Test your own configuration. Each row is a script family with the evidence to keep. Run them in a sandbox that mirrors the live build.

AreaWhat to testEvidence to keep
Form buildEvery approved form matches the protocol and the specification: fields, units, ranges, required flagsPrinted blank eCRF compared to specification; reviewer initials
Skip logicHidden and shown fields behave for each branchScreenshots or tester notes per branch
Calculated fieldsDerived values match a hand calculation for several inputs, including edge valuesInput, expected and actual values
Edit checksEach rule fires on a breaking value, does not fire on a valid value, raises an auto-query with the right message and priorityTest data sheet with expected result
Roles and permissionsEach role sees only what it should; blinded roles do not see arm values; site coordinators see participant names while others see coded IDsRole-by-function matrix, tester signature
Audit trailEdit a value, give a reason, confirm timestamp, user, old and new value are recorded and cannot be editedAudit trail export
E-signaturesSign and countersign, confirm the signature meaning and what happens after a record changesSigned record export
Visit schedule and windowsVisits appear on the right day and out-of-window handling worksSchedule printout against protocol
ExportsExport content and format match the specification; data dictionary matches formsExport file and checklist
Query workflowRaise, answer, close and re-open a query; confirm history is keptQuery log extract

Use realistic test data and negative tests (wrong values, wrong role), not only the happy path. Capture's free sandbox has every feature so you can run this before go-live.

Run these scripts on a real build today

Build the study, invite your QA reviewer and execute the script families above in the sandbox. Free, every feature, no credit card.

Run your UAT in the free sandbox

Phase 5

Release and go-live sign-off

Once testing is complete, make the decision explicit.

Deviations resolved or accepted

Every failed script is fixed and retested, or the risk is documented and approved.

Validation summary report

One to two pages: scope, what was tested, results, open items and a statement on fitness for use.

Approved forms are locked

Only approved forms appear in the casebook for live use. Confirm the live build equals the tested build.

Users and training

Accounts created for the right roles; training records on file; delegation log in place (see the delegation log template).

Approvals

QA, data management and the study lead sign before the first participant is entered.

Phase 6

After go-live: change control and periodic review

Validation is not a one-time event. Protocol amendments and vendor releases both change the system.

Change log

Record each amendment-driven form change, its risk and its retest. See eCRF versioning mid-study.

Vendor release review

Ask how releases are notified and decide whether a regression check is needed for your study.

Access review

Periodically review accounts, roles and leavers. See role-based access control.

Audit trail spot checks

Sample edits and confirm reasons for change are meaningful. See audit trail software.

Incident and deviation handling

Keep a record of system problems, their impact on data and the fix.

Retirement and archive

Plan export of data, audit trail and dictionary at study close.

What to look for

The controls an auditor will ask about first

Most validation questions come back to a short list of controls. These are the ones Capture provides, described as Part 11-aligned controls rather than a certification.

  • Field-level audit trail with timestamp, user identity, old value, new value and reason for change; always exportable and not modifiable through the interface.
  • Electronic signatures with password re-authentication and a meaning statement.
  • Role-based access, with blinded roles enforced at the database layer.
  • Forms move draft to approved; approved forms are locked for live use.
Audit-ready clinical trial data

Weight changed 68.0 to 68.5 kg

Site coordinator · Reason: Transcription error

9f2c…a71e

Query Q-0014 answered on Weight

Site coordinator · Reason: Source checked

4b8d…c203

Vital signs form locked

Data manager · Reason: Visit cleaned

e61a…58f0
Verify chain Intact

FAQ

Questions teams ask before they switch

Something not covered here? Ask us directly.

Who is responsible for validating an EDC?

The sponsor is responsible for showing that the system is fit for its intended use in the study, even when the vendor supplies the software and evidence. A CRO may do the work on the sponsor's behalf.

Do we have to validate the vendor's whole product?

Generally no. A risk-based approach relies on vendor evidence for the platform and focuses your own testing on your configuration and study-specific rules. Confirm the approach with your quality adviser.

Is the Capture sandbox suitable for UAT?

Yes for rehearsing and testing a build: it has every feature and no time limit. Keep records of what you tested; the test record is yours.

Does Capture provide validation documentation?

Enterprise customers receive documentation to support sponsor validation and UAT. Ask us what is available for your study during a demo.

How often should we revalidate?

Re-test when the study build changes or when a vendor release affects a function you rely on, and review periodically. The right cadence follows your risk assessment.

Is Capture 21 CFR Part 11 compliant?

Capture provides 21 CFR Part 11-aligned controls. Compliance is shared with the sponsor's validated use. This is not legal advice.

Rehearse your validation free

Free sandbox with every feature. No credit card, and you pay only when you go live with real participants.

Run your UAT in the free sandbox