Site initiation visit (SIV) checklist

The initiation visit is the last checkpoint before a site can enrol. This checklist covers what to confirm before the visit, a realistic agenda, the items to check area by area, and the action log that decides whether the site is cleared to start.

  • Pre-visit readiness
  • Timed agenda
  • Action log and sign-off

Free sandbox · No credit card · 21 CFR Part 11 aligned

SIV readiness · Site 004 (demo)

Items

26

Done

21

Open

5

  • Ethics approval and contract in placeFiled in ISF
  • Delegation log signed by investigatorAll six staff
  • Protocol training attendedAttendance sheet signed
  • Investigational product storage checkedFridge log not yet started
  • EDC accounts and rolesTwo coordinators pending
Demo values, not a real site

Key points

  • The site initiation visit (SIV) confirms that the site is ready, trained and equipped before the first participant is screened. It can be on site or remote, and sponsors usually define the format in the monitoring plan.
  • Treat it as a gate with a written outcome: items checked, items open, owners, dates, and a clear statement of whether the site may start.
  • The investigator duties behind it are in ICH E6(R2) section 4: adequate recruitment potential (4.2.1), enough time and resources (4.2.2), staff informed about the protocol, product and duties (4.2.4), and a list of qualified persons with delegated duties (4.1.5). Check the current guideline text.
  • Use the same checklist at every site. Consistency is what lets a sponsor compare sites and an inspector see that none was waved through.
  • This is the pre-enrolment visit. For routine visits afterwards use the monitoring visit report template; for the whole start-up process see the investigator-initiated trial start-up checklist.

Purpose

What the site initiation visit is for

By the time of the initiation visit, the site has usually been selected, the contract and budget agreed, and the ethics approval granted. What remains is practical: does everyone who will work on the study understand it, can they do it, and is everything in place to do it safely? The visit is where the monitor or study manager walks the team through the protocol, the procedures and the systems, and verifies the file, the facilities and the training.

It also creates a record. The attendance sheet, the training log, the completed checklist and the follow-up letter show that the site was ready at the time it started. For an investigator-initiated study with no external monitor, the same exercise is a team readiness meeting, led by the study manager and signed by the principal investigator. If you are the sponsor-investigator, see how to become a sponsor-investigator for the wider responsibilities.

Remote initiation is common, especially for small and decentralised studies. The checklist is the same; only the way you check physical items changes, for example by video walk-through of the storage area and shared screens for the systems. Agree the format with the sponsor in advance.

Before the visit

Pre-visit readiness: confirm these two weeks before

If any of these is missing, the visit will turn into a document chase. Send the list to the site with the agenda.

Ethics approval and any regulatory approval

Approved protocol, version number, consent form versions, approval letter in the site file.

Contract and budget signed

Both parties, dated, filed.

Investigator qualifications

CV, training certificates and licence for each staff member who will be delegated tasks.

Essential documents in the investigator site file

Compare against the investigator site file index template.

Study supplies ordered or shipped

Investigational product only after required approvals; lab kits, equipment, forms.

Systems access requested

EDC, safety reporting and any other tools; user list sent to the sponsor.

Attendee list confirmed

Investigator, sub-investigators, coordinator, nurse, pharmacist, lab lead, data entry staff.

Agenda and training materials sent

So the team can read the protocol first.

Agenda

A half-day SIV agenda (demo)

A realistic running order for a small multi-site study. Adjust the timings to protocol complexity. Times are examples.

TimeSessionLeadOutput
09:00Welcome, introductions, study overview and timelinesStudy managerAttendance sheet started
09:30Protocol walk-through: objectives, design, eligibility, visits, endpointsMonitor or study leadQuestions logged
10:30Break
10:45Informed consent process and participant materialsStudy managerConsent procedure agreed
11:15Safety: adverse event definitions, SAE reporting timelines, escalation contactsMedical leadContact sheet handed over
11:45Investigational product: receipt, storage, accountability, returnsPharmacist or monitorStorage inspected or video-checked
12:15Lunch
13:00Data and systems: eCRF completion, queries, source documents, user accountsData managerAccounts and roles confirmed
14:00Samples, labs and equipment: handling, shipping, calibrationLab leadEquipment list signed
14:30Site file, delegation log, deviations and documentationMonitorFile reviewed
15:15Questions, open items and sign-offAllAction log drafted

Name the start-up lead for the sponsor and the principal investigator for the site in the header of the agenda.

The checklist

SIV checklist, area by area

Use one row per check. Mark each Yes, No or N/A, with a date and initials, and write actions in the log, not in the margin.

AreaCheckEvidence
ApprovalsCurrent protocol and consent versions are approved and are the ones in use.Approval letters, version table
Investigator and staffAll staff are listed, qualified and have a signature on the delegation log.Delegation log, CVs, GCP training certificates
DelegationThe investigator has signed each delegated task; no one will work before delegation.See the delegation log template
Protocol understandingTeam can state eligibility, visit windows, key assessments and prohibited medication.Training record, Q&A notes
Informed consentProcess, timing and documentation are clear; current consent form is available.Consent SOP or procedure, sample form
Screening and enrolmentScreening log set up; plan for recruitment and pre-screening agreed.See the recruitment plan template
Investigational productStorage secure, temperature monitored, accountability log in place, responsible person named.Storage check, IMP accountability log
Safety reportingAE and SAE definitions known; timelines and contacts understood; reporting route tested.Contact sheet, SAE report form template
Data captureUsers have accounts with the right roles; eCRF completion rules explained; query process explained.User list, eCRF completion guidelines
Source documentsWhat counts as source for each data point is agreed; source locations are identified.Source document list
Samples and labsCollection, processing, storage and shipping steps are clear; kits and courier arranged.Lab manual, courier booking
EquipmentRequired equipment is available, calibrated and logged.Calibration certificates
Site fileInvestigator site file structure set up; essential documents in place.ISF index
Monitoring and oversightMonitoring plan and frequency shared; contact points known.Monitoring plan
Deviations and notesHow deviations and notes to file are handled is understood.See the note to file template
Data protectionParticipant data handled per protocol and local data protection rules; identifiers segregated.Privacy documentation
Close of visitOpen items logged with owners and dates; decision on readiness recorded.Action log, signed report

Add or remove rows to fit your protocol. Rows are prompts for evidence, not guarantees of compliance; the sponsor SOP and local rules decide.

Let the team practise on the real study build

Before the visit, set up the study in the free sandbox so coordinators can enter demo data, trigger a query and see their role, instead of learning the system on day one.

Start free

Worked example

SIV action log (demo)

After the visit, every open item goes into one log. Here is a short example for an imaginary site. Names and numbers are invented.

#Open itemOwnerDueBlocks start?
1Start temperature log for the investigational product fridge and send first week to monitorPharmacist+3 daysYes
2Add start dates for two sub-investigators to the delegation logCoordinator+2 daysYes
3Create EDC accounts for the remaining two coordinatorsStudy manager+2 daysYes
4Confirm courier pick-up days for central lab samplesLab lead+5 daysNo
5File training attendance sheet and certificatesCoordinator+3 daysNo
6Send follow-up letter summarising the visit and open itemsMonitor+5 daysNo

The site is cleared to start when every item marked "Blocks start" is closed and the sponsor confirms in writing. Keep the confirmation in the site file.

After the visit

Closing the loop, step by step

  1. 1

    Draft the report within days

    Record who attended, what was covered, what was checked, and what is open. Use the same template for every site.

  2. 2

    Send a follow-up letter

    List the action items with owners and due dates, and say plainly which ones block the start.

  3. 3

    Track actions to closure

    Keep a single log. Verify closure with evidence, not a promise.

  4. 4

    Confirm site activation in writing

    The sponsor or study lead confirms that the site may screen. File the confirmation with the report.

  5. 5

    File everything

    Attendance sheet, agenda, training materials, checklist, report, follow-up letter, and activation confirmation in the site file and the trial master file. See how to set up a trial master file.

  6. 6

    Plan the first monitoring visit

    Use the open items and the first enrolments to decide when. See the monitoring visit report template.

In Capture

Have the study built before the site arrives

Capture is an all-in-one clinical trial platform, so the study the site will use can be built and tested before the initiation visit. Roles separate researchers from site coordinators; a separate site coordinator portal keeps a site working in its own space; and the blank eCRF PDF export gives you a printed set of every approved form for the training pack. You can also upload a protocol and let the AI study builder draft visits and forms, which a person reviews before anything is saved.

  • Site coordinator portal with by-site filtering.
  • Role-based access with PII segregation.
  • Blank eCRF PDF export for training and ethics.
  • Draft to approved form lifecycle; approved forms are locked for live use.
Clinical trial study start-up software
  • SO

    Study owner

    Builds and configures the study

  • PI

    Principal investigator

    Oversees the site, signs off the casebook

  • SI

    Sub-investigator

    Enters and signs clinical data

  • SC

    Study coordinator

    Screens subjects, enters visit data

  • CRA

    Monitor (CRA)

    Verifies data, raises queries

  • DM

    Data manager

    Reviews, freezes and locks data

  • PT

    Participant

    Completes their own questionnaires

Common problems

What typically goes wrong at initiation

The recurring problems are mundane. Key staff cannot attend, so they are trained second-hand and no one records it. The delegation log is signed on the day, in a hurry, with dates missing. The investigational product arrives before the storage is ready. User accounts are requested late, so coordinators see the system for the first time at the visit. Documents are filed in the wrong place or not at all. And the visit ends without a written decision on whether the site can start.

Each has a simple prevention: a pre-visit checklist two weeks ahead, a rule that anyone who misses training is trained and recorded separately before they work, a storage check before shipment, accounts requested at contract signature, and a signed activation statement. When a problem still happens, record it plainly; the note to file template is the right tool for the explanation, and the protocol deviation tracking guide for anything that touches the protocol.

FAQ

Questions about this template

Something not covered here? Ask us directly.

What is a site initiation visit?

A site initiation visit is the meeting, on site or remote, where the sponsor or study team confirms that a site is trained, equipped and documented before it screens its first participant. It covers the protocol, procedures, systems, product handling and the site file.

Who attends the site initiation visit?

The principal investigator, sub-investigators, study coordinator, research nurses, pharmacist, lab lead and data entry staff, plus the sponsor representative or monitor. Anyone who will perform a delegated task should attend or be trained and recorded separately.

How long does a site initiation visit take?

Often half a day to a day, depending on the complexity of the protocol and systems. The sample agenda here is a half-day. Remote visits are sometimes split across several shorter sessions.

Can a site initiation visit be done remotely?

Often yes, especially for small or decentralised studies, if the sponsor agrees. Physical checks such as storage or equipment can be done by video, and training by screen share. Document the format and what was verified.

What documents should be ready for the SIV?

Approvals, signed contract, CVs and training certificates, the delegation log, the consent form versions, the site file structure and any supply or system access confirmations. The pre-visit checklist on this page lists them.

Does ICH GCP require a site initiation visit?

ICH E6 describes investigator responsibilities such as adequate resources, qualified staff and training, and sponsor monitoring duties, but whether an initiation visit is required and in what form is set by the sponsor monitoring plan and local rules. Check the current guideline text and your plan.

What is the difference between an SIV and a monitoring visit?

The initiation visit happens before enrolment and focuses on readiness, training and set-up. Monitoring visits happen during the study and focus on data, consent, safety and compliance. The documents differ, though both end with an action log.

Who decides that a site can start?

The sponsor, or the study lead for an investigator-initiated study, usually confirms activation in writing once approvals are in place and blocking actions are closed. File that confirmation with the visit report.

Build and test the study before initiation

Free sandbox with every feature. No credit card, and you pay only when you go live with real participants.

Start free