After go-live
Keeping the system in a validated state
Validation is not a one-off. Protocol amendments change forms, platform releases change software and staff change roles. A light-touch change control process covers this: record the change, assess the risk, retest what is affected, approve and file. Our guide to eCRF versioning for mid-study changes shows how to treat changed forms, and the EDC go-live checklist gives a final gate before enrolment.
Revisit the risk table at least when the protocol changes materially and when the vendor announces a change that touches a high-risk function. Review user access periodically, remove leavers promptly and keep training records. At the end of the study, keep the validation file with the trial master file for the retention period that applies (see archiving and retention).
Where a self-serve EDC helps
Self-serve platforms lower the effort of validation for small teams:
- You can build and test in a free sandbox before any participant is enrolled, so scripts run against the real configuration.
- Field-level audit trail with timestamp, user, old value, new value and reason for change is available on every record.
- Role-based access with PII segregation can be tested as each role.
- Forms use draft and approved states, which supports configuration control.
- Capture provides 21 CFR Part 11-aligned controls; validated use is shared between the platform and the sponsor.
Stage 1
DraftBuild and edit freely
Stage 2
ApprovedLocked for live use
Stage 3
In the casebookOnly approved forms
SDV requirement changed on Systolic BP
Data manager · Reason: critical safety value
Form approved: Vital Signs (VS) v2
Study owner · Locked for live use
Answer changed: Weight 68.0 to 68.5 kg
Site coordinator · Reason: transcription error