Six areas, about forty specific checks, and the evidence to ask for in each: eligible patients and recruitment, investigator and staff, facilities and equipment, ethics and regulatory timelines, data and systems readiness, and contracts and budget. Use it to write your feasibility questionnaire, to run the qualification visit and to compare sites on the same terms.
Free sandbox · No credit card · 21 CFR Part 11 compliant
Eligible patients (12 mo)
46
Committed enrolment
12
Ethics approval est.
8 weeks
Site feasibility in brief
Definitions
Three activities get called “feasibility” and it helps to keep them apart. Protocol feasibility tests the design itself: are the eligibility criteria, visit burden and endpoints realistic for the population at all? Site feasibility tests a particular site against that protocol, usually with a questionnaire followed by a call or visit. Site qualification (sometimes a pre-study or site selection visit) confirms on the spot what the questionnaire claimed. After selection come contracts, approvals and the site initiation visit.
ICH E6(R3) puts the responsibility on both sides: the sponsor selects investigators who are qualified by training and experience and who have adequate resources, and the investigator must have the time, staff and facilities to conduct the trial properly. A feasibility checklist is how a sponsor documents that judgement, and how a principal investigator checks they can honestly commit. For a sponsor-investigator running their own study, the investigator-initiated trial start-up checklist covers the wider set-up.
Send the questionnaire once the protocol synopsis is stable, ideally while eligibility criteria can still change. Feasibility answers that show the criteria exclude most patients are a reason to revisit the design, not only to add sites. The sites needed calculator and the enrollment forecast calculator turn per-site rates into the number of sites and the timeline.
The checklist
Copy these into your feasibility questionnaire. Each “how” is the evidence that turns a yes into a verifiable answer.
Number of patients seen in the last 12 months who meet the key inclusion criteria, from a records query, with the top three exclusion criteria applied.
List of open or planned trials at the site in the same population, and how patients are allocated between them.
Enrolled versus target in the last two or three similar trials, and the screen-failure rate seen.
Which clinics or partner practices refer, whether patient databases may be contacted, and what advertising the ethics committee usually accepts.
Typical travel distance and time, visit length the population tolerates, transport or reimbursement policies, languages needed.
Current trial load, protected time for this study, relevant specialty experience, current GCP training certificate and CV.
Named coordinator with hours per week for this study, a named backup, and recent staff turnover.
Sub-investigators, trained raters for any clinician-rated scale, pharmacist, phlebotomy and data entry, with who will be on the delegation log.
Recent regulatory inspections or sponsor audits and any significant findings, with how they were closed.
Secure, access-controlled storage at the required temperature, with continuous monitoring, alarm and excursion records.
Centrifuge (refrigerated if needed), freezers at the required temperature with logs, dry ice and courier pick-up times.
Every device the protocol needs (ECG, spirometer, scales, imaging) with model and calibration or maintenance records.
Room for long or fasting visits, private space for consent, weekend or overnight cover if the schedule needs it.
Accreditation or certification, reference ranges document, turnaround times, if a local lab is used.
Central or local committee, meeting dates, submission deadlines and the usual time from submission to approval.
Other sign-offs the institution needs (research office, radiation safety, biosafety, pharmacy, data protection) and their timelines.
Country- or site-specific forms (for US sites under an IND, the investigator statement on Form FDA 1572), local consent template rules, translation needs.
Whether source is paper, the electronic health record or direct entry, and how certified copies are made.
Whether monitors can review source remotely, and what access the site allows to its records systems.
Computers or tablets for EDC and eConsent, reliable internet in the clinic rooms, and staff experience with electronic data capture.
Whether participants can use their own phones for questionnaires, and how the site will help those who cannot.
Whether the site accepts your contract template, who signs, typical negotiation time, and insurance or indemnity requirements.
Fees per visit and procedure, start-up and archiving fees, overhead rate, and which procedures are standard of care.
How the site invoices, payment terms, and how participant reimbursements are paid.
Interpreting answers
One red flag rarely rules a site out. It tells you what to verify at the qualification visit and what to write into the plan.
| Area | Red flag | Ask next |
|---|---|---|
| Patients | Committed enrolment higher than the records count allows | How the number was derived; ask for the query and criteria used. |
| Patients | Several competing trials in the same population | Which trial gets first referral, and whether the PI leads the competitor. |
| Staff | No named coordinator, or one shared across many studies | Hours for this study in writing; backup plan for leave. |
| Facilities | Investigational product or sample freezer without temperature logs | Whether logging can be in place before activation; who responds to alarms. |
| Ethics | Committee meets rarely or has a long queue | Earliest realistic approval date; whether a central committee can be used. |
| Data | No remote monitoring access and paper-only source | Monitoring visit frequency and cost; source document worksheets. |
| Contracts | Template rejected, long legal queue | Clauses at issue; parallel negotiation while ethics review runs. |
Deciding
Give each of the six areas a simple rating (green, amber, red) with a one-line reason, and weight patient population and staff capacity most, because they are hardest to fix after activation. A site with a red rating on facilities may be fixable with a loaned device; a site with no eligible patients is not. Record the answers and the decision in the trial master file.
Be sceptical of round numbers. A site that commits to 20 participants with a records count of 25 eligible patients is promising nearly everyone it sees; a site that commits to 8 with a count of 60 is being realistic. Recruitment tends to run slower than planned, so add sites or time rather than assume every site hits its target. The patient recruitment playbook for small trials and the recruitment plan template help turn the feasibility answers into a recruitment plan per site.
Carry the feasibility answers forward: the committed enrolment becomes the site target on your dashboard, the equipment list becomes part of the site file, and open amber items become actions before the initiation visit. The screening and enrollment log template and the investigator site file index are the next documents most sites need.
Process
Turn each key criterion, procedure and piece of equipment into a question with the evidence you want back. Keep it short enough that a busy coordinator answers it properly.
Share the synopsis, not the full protocol, until the site signs.
Walk through recruitment numbers and staff time with the investigator and coordinator together.
See the storage, the equipment and the rooms; confirm the answers that matter most.
Rate the six areas the same way for every site, and document the decision.
Contracts, ethics, training and the initiation visit, with feasibility actions tracked to closure.
Set up sites, QR enrollment and site-level participant numbering in the free sandbox, and export the blank eCRF PDF for ethics submission. No credit card, no time limit.
In Capture
Section 5 of the checklist is the one sponsors can make easy. With Capture, sites need a browser, not new hardware, and participants need their own phone, not an app. You can build the whole study in the free sandbox, walk each site’s coordinator through it during feasibility, and send each ethics committee the same blank eCRF PDF (cover page, form index, visit-by-form matrix and every approved form printed empty).
Sites
4
Enrolled
31
Target
48
12 / 12
9 / 14
7 / 12
3 / 10
A structured list of what a sponsor checks before selecting a trial site: eligible patients and recruitment, investigator and staff capacity, facilities and equipment, ethics and regulatory timelines, data and systems readiness, and contracts and budget, each with the evidence the site should provide.
Site feasibility assesses whether a particular site can run a planned trial. A feasibility study is itself a small study that tests whether a larger trial is possible, for example whether people can be recruited and retained.
Usually the site coordinator with the principal investigator, who should confirm the recruitment numbers and their own time. The sponsor or its delegate reviews the answers and follows up.
Ask for a count from patient records with the key criteria applied, the site’s record in similar trials, and the trials competing for the same patients. Compare the committed number with the count, and expect a slower start than promised.
Selection, contracts and budget, ethics and institutional approvals, staff training, and the site initiation visit. Open items from feasibility should be tracked to closure before the first participant.
Sites use a browser and participants use their own phones. You get QR-code enrollment per site or per study, site-level participant numbering, a separate site coordinator portal and by-site filtering and exports, and you can build and test everything in the free sandbox before any site is activated.
Keep exploring
Site initiation visit checklist
The next step after a site is selected.
Clinical trial sites needed calculator
How many sites the target needs.
Enrollment forecast calculator
Timeline from per-site rates.
Multi-site trial management
Running several sites in one study.
QR code participant enrollment
Site-specific enrollment with no app.
EDC for feasibility studies
The other meaning of feasibility.
Build the study once, give each site its own QR enrollment and participant numbering, and review data by site. Free sandbox, no credit card, no time limit.